Terminal Connection And Wiring Method - LG-Nortel ipLDK-60 Installation Manual

Hardware
Table of Contents

Advertisement

4.4 Installation of the CO Line & Extension Board ..........................................................29
4.4.1 CHB308 (3 CO Line and 8 Hybrid Interface Board) ........................................................... 29
4.4.2 CSB316 (3 CO and 16 SLT Interface Board)..................................................................... 41
4.4.3 SLIB8 (8 SLT Interface Board) .......................................................................................... 44
4.4.4 VOIB (Voice over Internet protocol Board (4ch))................................................................ 45
4.4.5
4.5 Other Board Installations ............................................................................................49
4.5.2 Modem Function Unit (MODU).......................................................................................... 50
5 TERMINAL CONNECTION AND WIRING METHOD........................................ 51
5.1 Terminal and Door Phone Models ..............................................................................51
5.1.1 Terminal Cabling Distance ................................................................................................ 52
5.1.2 Basic Terminal Connection ............................................................................................... 53
5.1.3 Connecting Additional Terminals....................................................................................... 54
5.2 Cable Wiring.................................................................................................................55
5.2.1 Wall Mount Wiring ............................................................................................................ 55
5.2.2 Rack Mount Wiring ........................................................................................................... 56
6 STARTING THE IPLDK-60................................................................................ 57
6.1 Before Starting the ipLDK-60 System.........................................................................57
6.2 Basic Programming.....................................................................................................58
6.2.1 DKT Programming............................................................................................................ 58
6.2.2 Entering the Programming Mode....................................................................................... 59
6.2.3 Pre-Programming ............................................................................................................. 60
7 TROUBLESHOOTING ...................................................................................... 66
Board)....................................................................... 47
II
JAN, 2007

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents