Installation - Suburban DD-17DSI Service Manual

Rv furnaces
Hide thumbs Also See for DD-17DSI:
Table of Contents

Advertisement

There are several important aspects of the installation which will pertain to all Suburban forced draft furnaces, regardless of the model or the
method in which they are installed. They are:
1.
Selecting a Location
2.
Venting
3.
Return Air
4.
Ducting
Refer to the furnace installation manual for all installation requirements.
Location and Installation- Locate the furnace near lengthwise center of the coach. Choose a location for installation out of the way of wires,
pipes, etc. which might interfere with the installation. Adhere to the minimum clearances from cabinet to combustible construction as
listed in the installation manual for your specific furnace model. Secure furnace cabinet to the floor of the coach using the holes
provided in the furnace cabinet.

INSTALLATION

Figure 1
5

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents