Recommended - Through Wall With Vertical Rise And Horizontal Termination Installation; Through Concrete Wall With Vertical Rise Installations - Vistaflame VF-55-FS Technical Manual

Pellet stove
Hide thumbs Also See for VF-55-FS:
Table of Contents

Advertisement

recommended - t
A 45° down elbow with a screen may be used in
place of the termination cap (or stainless steel
termination hood).
t
c
hrough
oncrete
Installation to use if there is a concrete or
retaining wall in line with exhaust vent on
pellet stove.
A 45° down elbow with a screen may be used
in place of the termination cap (or stainless
steel termination hood).
The termination must be 12 inches (30 cm)
from the outside wall and 12 inches (30 cm)
above the ground.
14
Installation
W
W
hrough
all
ith
W
W
v
all
ith
ertical
v
r
h
ertical
iSe and
orizontal
Termination cap
Wall framing
Vertical section
of vent pipe
Figure 14: Venting horizontally with rise.
r
i
:
iSe
nStallationS
Horizontal frame
for thimble
Wall thimble
90
o
elbow
Wall framing
Vertical section
of vent pipe
Figure 15: Venting with concrete wall behind unit .
t
ermination
90°elbow
i
:
nStallation
Wall strap
Horizontal
frame for
thimble
Clean
out tee
Wall thimble
Termination cap
Concrete Wall
Clean out tee

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents