Checklists - Gearmore RC30-60 Operation, Service & Parts Manual

Rotary mower
Table of Contents

Advertisement

DEALER PREPARATION CHECKLIST
THIS CHECKLIST TO REMAIN IN OWNER'S MANUAL
I
T IS THE RESPONSIBILITY OF THE DEALER TO COMPLETE THE PROCEDURES LISTED
BELOW BEFORE THE DELIVERY OR THE SALE OF THIS IMPLEMENT TO THE CUSTOMER
Dealer Preparation Check List
1.
Implement is completely assembled.
2.
Gearbox filled with oil. (See page 12)
3.
All fittings lubricated. (See page 12)
4.
All shields in place and in good condition.
5.
All fasteners torqued to specifications given in Torque Chart. (See page 15)
6.
Check PTO driveline. Make sure it is the correct length to operate rotary
mower with intended tractor.
7.
Check front of input gearbox shaft and make sure that snap ring is
properly installed. (This is for smooth bore input shaft only.)
8.
Check shear bolt for proper grade and installation.
9.
All decals in place and readable. (See page 5)
10. Overall condition good (i.e. paint, welds, etc.).
11. Operator's manual has been given to owner and the owner has been instructed
on the safe and proper use of the rotary mower.
12. Purchaser elects to delete deflectors. (front and rear rubber belt, front and
rear chains)
______________________________________________________________________________________________________________________________
For Non-Agricultural use OSHA, ASAE, SAE, and ANSI standards require the use of Chain
Guards or other protective guards at all times. Manufacturer strongly recommends the use of
such guards for Agricultural uses as well, to reduce the risk of property damage, serious bodily
injury or even death from objects thrown out by or from contact with the cutting blades.
Dealer's Signature:____________________________________
Purchaser's Signature:__________________________________
WARNING
2
.

Advertisement

Table of Contents
loading

This manual is also suitable for:

Rc30-72Rc30-84

Table of Contents