Dunkirk Q95M-200 Installation, Operation & Maintanance Manual page 44

Gas-fired direct vent modulating hot water boiler
Table of Contents

Advertisement

wiring diagram 9: multiple boiler wiring (amb-4)
WATER SENSOR
OUTSIDE SENSOR
IF USING EXTERNAL DAY/NIGHT FEATURE
CONNECT HERE (DRY CONTACT)
IF USING REQ/ACK CONNECT HERE
(TT/THERMOSTAT DRY CONTACT)
TO PRIORITY IF USING
(DRY CONTACT)
Yellow
Yellow
Black
White
wiring diagram10: multiple boiler wiring (amb-8)
WATER SENSOR
OUTSIDE SENSOR
IF USING EXTERNAL DAY/NIGHT FEATURE
CONNECT HERE (DRY CONTACT)
IF USING REQ/ACK CONNECT HERE
(TT/THERMOSTAT DRY CONTACT)
TO PRIORITY IF USING
(DRY CONTACT)
Yellow
Yellow
Black
White
Xvi - pipinG and wirinG appendiX
WHITE
120 V
BLACK
TO
TO
BOILER
BOILER
T-T
T-T
WHITE
120 V
BLACK
TO
TO
TO
AUXILIARY
BOILER T-T
BOILER
DEVICE
(TERMINALS
T-T
1&2)
TO
TO
TO
TO
BOILER T-T
BOILER T-T
BOILER
BOILER
(TERMINALS
(TERMINALS
T-T
T-T
1&2)
1&2)
44
AMB-4
CH T1
CH T2
DWH T1
DHW T2
A1
A2
BOILER CONTROL PANEL
CH T1
CH T2
BOILER
BOILER
DWH T1
1
2
DHW T2
A1
A2
BOILER CONTROL PANEL
AMB-8
CH T1
CH T2
DWH T1
DHW T2
A1
A2
BOILER CONTROL PANEL
CH T1
CH T2
BOILER
BOILER
DWH T1
2
1
DHW T2
A1
A2
BOILER CONTROL PANEL
L1
L2
CH C1
CH C2
DHW C1
BOILER
DHW C2
1 CIRC
L1
L2
CH C1
CH C2
DHW C1
BOILER
DHW C2
2 CIRC
L1
L2
CH C1
CH C2
DHW C1
BOILER
DHW C2
1 CIRC
L1
L2
CH C1
CH C2
DHW C1
BOILER
DHW C2
2 CIRC

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents