Sharp 13VT-N100 Service Manual page 38

Tv/vcr combination
Table of Contents

Advertisement

13VT-N100
13VT-N150
13VT-CN10
INSTALLING THE MASTER CAM (AT REAR
SIDE OF MECHANISM CHASSIS)
1. Make sure beforehand that the shifter is at the point as
shown below.
2. Place the master cam in the position as shown below.
Fully turn
clockwise
Fully turn counterclockwise
Face the wide tooth side ward
Figure 1-44-1.
Note:
See the figure below for the phase matching between the
master cam and the casecon drive gear.
3. Finally fix with the E-ring.
Master cam
Casecon drive gear
Round mark
When installing the master cam,
align the casecon drive gear
round mark with the half-round
notch of master cam.
Figure 1-44-2.
REPLACEMENT OF LOADING MOTOR
• Removal
E-ring
(XRESJ30-06000)
Master cam
• Replacement
1. Remove the loading motor, and install the replace-
ment loading motor as shown below.
Half-round notch
The loading motor pressing-in must be less than
14.7 N (15 gf).
Adjust the distance between motor and pulley to
10.2
38
Apply grease
Figure 1-45.
Figure 1-46.
+0.2
mm).
–0.2
Apply grease
No grease
+0.2
10.2
mm
–0.2

Advertisement

Table of Contents
loading

This manual is also suitable for:

13vt-n15013vt-cn10

Table of Contents