RBI Spectrum Series Installation And Operation Instructions Manual page 11

Table of Contents

Advertisement

Typical Primary/Secondary Piping System
Figure 5
(See Notes)
NOTES:
1. Boiler circuit piping must be sized
large enough to handle maximum
fl ow through unit.
2. Boiler pump sized to boiler design
fl ow requirements.
3. All boilers furnished with factory
mounted outlet water temperature
gauge.
4. Boiler pump purging required. Use
terminals supplied.
Notice: These drawings show suggested
piping confi guration and valving.
Check with local codes and ordinances for
specifi c requirements.
Low Temperature Piping with Thermostatic Valve
Figure 6
(See Notes)
NOTES:
1. For pump selection consult factory.
2. Boiler pump sized to boiler and thermostatic 3-way valve design fl ow requirements.
3. Boiler circuit piping must be sized large enough to handle maximum fl ow through unit.
4. All boilers furnished with factory mounted outlet water temperature gauge.
5. Boiler pump purging required. Use terminals supplied.
6. Valve is precalibrated for 140°F return temperature.
Notice: These drawings show suggested piping confi guration and valving.
Check with local codes and ordinances for specifi c requirements.
F F
Finned copper tube gas boilers & water heaters – Boiler Manual
Fi
d
b
b il
&
h
B il
M
H-1 Rev 4
H-18 Rev 3
l
Pump
Gate Valve
Globe Valve
Angle Valve
Bufferfly Valve
Balance Valve
Ball Valve
Motorized Valve
Solenoid
Operated Valve
Self-Operated
Valve
Pressure
Reducing Valve
Check Valve
Pressure
Relief Valve
Flow Switch
Thermometer
Aquastat Union
Pressure Switch
Gas Pressure
Regulator
Automatic
Air Vent
Backflow-
Prevention
Device
3-Way Valve
Expansion
Tank
11

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents