COMBUSTION AIR & VENTILATION
Th is boiler/water heater must be supplied with
combustion air in accordance with Section 5.3, Air
for Combustion & Ventilation, of the latest revision
of the National Fuel Gas Code, ANSI Z223.1/NFPA
54 and all applicable local building codes. Canadian
installations must comply with CSA B149.1 or .2
Installation Code for Gas Burning Appliances and
Equipment, or applicable provisions of the local
building codes. Failure to provide adequate combustion
air for this boiler/water heater can result in excessive
levels of carbon monoxide that can result in severe
personal injury or death!
To operate properly and safely this boiler/water heater requires a
continuous supply of air for combustion. NEVER store objects on
or around the boiler/water heater!
Combustion air contaminated with fl uorocarbons or
other halogenated compounds such as cleaning
solvents and refrigerants will result in the formation
of acids in the combustion chamber. Th ese acids will
cause premature failure of the boiler/water heater
voiding the warranty!
If the boiler/water heater is operated while the building
is under construction it MUST be protected from
wood, concrete, sheet rock and other types of dust.
Failure to properly protect the unit from construction
dust will damage the unit voiding the warranty!
All Air From Inside The Building
If the boiler/water heater is to be located in a confi ned space,
minimum clearances listed in Table 1 must be maintained between
the boiler/water heater and any combustible construction. When
installed in a confi ned space, Figures 1 and 2, two permanent
openings communicating with an additional room(s) are required.
Th e combined volume of these spaces must have suffi cient volume
to meet the criteria for an unconfi ned space. Th e total air
requirements of all gas utilization equipment, fi replaces, wood stoves
or any type of exhaust fan must be considered when making this
determination. Each opening must have a minimum free area of
/1000 Btu/hr, 2200 mm
1 in
2
of ALL gas utilization equipment in the confi ned area. Each opening
must be no less than 100 in
opening must be within 12 in, 305 mm of, but not less than 3 in,
76 mm from, the top of the enclosure. Th e bott om opening must be
within 12 in, 305 mm of, but not less than 3 in, 76 mm from, the
bott om of the enclosure.
4
Finned copper tube gas boilers & water heaters – Boiler Manual
F F
Fi
d
b
/kW based on the total input rating
2
, 64,516 mm
2
2
in size. Th e upper
b il
&
h
B il
All Air From Outside The Building
When installed in a confi ned space two permanent openings
communicating directly with, or by ducts to, the outdoors or spaces
that freely communicate with the outdoors must be present. Th e
upper opening must be within 12 in, 305 mm of, but not less than
3 in, 76 mm from, the top of the enclosure. Th e bott om opening
must be within 12 in, 305 mm of, but not less than 3 in,
76 mm from, the bott om of the enclosure.
Where directly communicating with the outdoors or communicating
with the outdoors through vertical ducts, each opening shall have
a minimum free area of 1 in
total input rating of all of the equipment in the enclosure.
Where communicating with the outdoors through horizontal ducts,
each opening shall have a minimum free area of 1 in
1100 mm
/kW of the total input rating of all of the equipment in the
2
enclosure.
When louvers and screens are used, they must have the same cross-
sectional area as the free area of the opening to which they connect.
When calculating the free area necessary to meet the make-up air
requirements of the enclosure, consideration must be given to the
blockage eff ects of louvers, grills and screens. Screens must have a
minimum mesh size of 1/4 in, 6.4mm. If the free area through a
louver or grill is not known, ducts should be sized per Table 3.
Canadian installations must comply with CSA B149.1 when air
supply is provided by natural air fl ow from the outdoors for natural
draft , partial fan-assisted, fan-assisted, or power draft -assisted
burners, there shall be a permanent air supply opening(s) having
a cross-sectional area of not less than 1 in
(310 mm
per kW) up to and including 1 million Btuh, plus
2
per 14,000 Btuh (155 mm
1 in
2
Btuh.
Table 3
Make-up Air Louver Sizing
Input
1/4 in 6.4 mm
(MBH)
Wire Screen
in
2
cm
100
25
161
150
37
858
200
50
322
250
62
400
300
75
484
350
87
561
400
100
645
M
l
/4000 Btu/hr, 550 mm
2
2
/2000 Btu/hr,
2
per 7,000 Btuh
per kW) in excess of 1 million
2
Required Cross Sectional Area
75% Free Area
25% Free Area
Metal Louvers
Wooden Louvers
2
in
2
cm
2
in
33
213
100
50
322
150
67
432
200
83
535
250
100
645
300
117
754
350
133
858
400
/kW of the
2
2
cm
2
645
967
1290
1612
1934
2257
2579