Common Operations To Carry Out - PIAGGIO Vespa 125 Super Operation And Maintenance

Allstyles scooters
Hide thumbs Also See for Vespa 125 Super:
Table of Contents

Advertisement

www.allstyles-scooters.com
OPERATING AND MAINTENANCE: COMMON OPERATIONS TO CARRY OUT
Fig. 8 - Removing engine cowl.
1. Lever for locking cowl. - 2. Front locating pin - 3. Clasp securing cowl to chassis - 4.
Rear hooked pivot pin.
REMOVAL OF ENGINE COWLING
- Pull the lever (1) and turn to release from cowling. Swing the cowling outwards so that
the front locating pin (2) is free of its housing.
- Lift the cowling upwards from the front pivoting on its rear section : so as release the
clasp (3) from the chassis bracket.
- Pull the cowling outwards on the locating pin (4) so as the latter clears its housing, thus
releasing the cowling.
- For reassembly carry out the reverse procedure.

Advertisement

Table of Contents
loading

This manual is also suitable for:

Vespa 150 super

Table of Contents