LG AS-W0964DH0/GH0 Service Manual page 16

Room air conditioner
Hide thumbs Also See for AS-W0964DH0/GH0:
Table of Contents

Advertisement

Wrap the insulation material around the connecting
portion.
1. Overlap the connection pipe heat insulation and the
indoor unit pipe heat insulation material. Bind them
together with vinyl tape so that there may be no gap.
2. Wrap the area which accommodates the rear piping
housing section with vinyl tape.
3. Bundle the piping and drain hose together by wrap-
ping them with cloth tape over the range within which
they fit into the rear piping housing section.
Reroute the pipings and the drain hose across the
back of the chassis.
Indoor unit installation
1. Remove the spacer.
2. Ensure that the hooks are properly seated on the
installation plate by moving it left and right.
3. Press the lower left and right sides of the unit against
the installation plate until the hooks engage into their
slots(clicking sound).
Plastic bands Insulation material
Connection
pipe
Vinyl tape
Wrap with vinyl tape
(wide)
Pipe
Vinyl tape(narrow)
Connecting cable
Pipe
Drain hose
Vinyl tape(narrow)
Wrap with
vinyl tape(wide)
Piping for
passage through
piping hole
Service Manual 21
Installation
Indoor
unit piping
Connecting
cable
Drain hose

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents