Mitsubishi Electric MCFH-13NV-E4 Service Manual page 56

Floor and ceiling type air conditioners
Table of Contents

Advertisement

OPERATING PROCEDURE
3. Removing the indoor heat exchanger.
(1) Remove the grill. (Refer to 1(1) (2))
(2) Remove the screws on both side and in front of the front
panel. (Photo 5)
(3) Remove the screws of the nozzle assembly. (Photo 6)
(4) Remove the electronic box . (Refer to 1)
(5) Remove the indoor fan motor . (Refer to 2)
(6) Remove the screws of the motor support .
(7) Remove the fan casing . (Iower)
(8) Remove the insulation of the drain pan and remove the
screws . (Photo 7)
(9) Remove the screws under the drain pan .(Photo 8)
(10) Remove the drain pan .
(11) Remove the indoor heat exchanger.
Photo 5
Screws
Photo 6
Photo 7
Photo 8
56
PHOTOS
Insulation and screws
screws
Screws

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents