Final Assembly; Testing And Adjustments; Maximum Range - Heath Zenith 4395 Installation And Operating Instructions Manual

Motion sensing diecast metal lantern
Table of Contents

Advertisement

Available languages

Available languages

FINAL ASSEMBLY

1. Push the wires into the junction box. Make sure none
of the wires get pinched.
2. Slide the fixture assembly onto the mounting screws.
Tighten decorative nuts removed in step 1 of Installation
section securely against fixture base.
Decorative Nut
3. Install one medium base light bulb (100 Watt maxi-
mum).
4. Place top cover onto fixture and attach using the two
decorative nuts (included). Hand tighten only.
5. Caulk around fixture base with silicone weather seal-
ant.
Decorative Nut
Fixture Assembly
Caulk Around
Fixture Base
204069-01
Mounting Screw
Junction Box
Top Cover
Light Bulb (100
Watt Maximum)

TESTING AND ADJUSTMENTS

1. Turn on the circuit breaker and light switch.
Note: Sensor has a 1
it will detect motion. When first turned on wait 1
minutes.
2. Set:
ON-TIME switch to TEST
SENSITIVITY dial to Midway
TEST 1 5 10
MINUTE
3. Walk through the coverage area noting where you are
when the lights turn on. In TEST mode, light will
stay on for 5 seconds after sensing motion and then
turn off.
4. Adjust the SENSITIVITY to increase or decrease
the range as needed. Too much sensitivity may cause
false triggering due to heat sources in the coverage
area (see Adjustment of Coverage Area or Troubleshooting
section).
5. Set the amount of ON-TIME you want the light to stay
on after motion is detected (1, 5, or 10 minutes).
6 ft.
(1.8 m)

Maximum Range

5
/
minute warm up period before
1
2
+
SEN
30 ft.
(9.1 m)
Maximum
Coverage Angle*
(Top View)
/
1
2
180°

Advertisement

Table of Contents
loading

Table of Contents