11-5. TROUBLESHOOTING FLOW
A How to check inverter/compressor
Disconnect the connector between
compressor and the power module (IC700).
Check the voltage between terminals.
Are the voltages balanced?
Yes
Check the compressor.
B Check of open phase
● With the connector between the compressor and the power module disconnected, activate the inverter and check if the in-
verter is normal by measuring the voltage balance between the terminals.
Output voltage is 50 - 130 V. (The voltage may differ according to the tester.)
<< Operation method>>
Start cooling or heating operation by pressing EMERGENCY OPERATION switch on the indoor unit. (TEST RUN OPERA-
TION: Refer to 8-3.)
<<Measurement point>>
At 3 points
BLK (U)-WHT (V)
BLK (U)-RED (W)
WHT(V)-RED (W)
NOTE: 1. Output voltage varies according to power supply voltage.
2. Measure the voltage by analog type tester.
3. During this check, LED of the inverter P.C. board fl ashes 9 times. (Refer to 11-6.1.)
C Check of compressor
Refer to 11-5.
"Check of compressor
winding".
Is the compressor normal?
Refer to 11-5.
"Check of compressor
operation time".
Does the compressor operate continuously?
OK.

OBH629A

No
Measure AC voltage between the lead wires at 3 points.
No
Yes
No
Yes
See 11-5.
"Check of open phase".
Replace the inverter P.C. board.
See 11-5.
"Check of compressor".
Replace the compressor.
Refer to 11-5.
"Check of compressor start failure".