Download Print this page

DAVIS SPREAD-SPECTRUM RADIO MODEM Manual page 10

Advertisement

4. Install Solar Power Kit and 6.5-Amp-Hour Battery (see "Installing Solar Power Kit &
Battery" on page 20).
5. Install Alarm Output Module
Consult the manual supplied with the Alarm Output Module for instruc-
tions. Consult the illustration above for positioning.
6. Install Radio Surge Protector (optional).
Consult the manual supplied with the Radio Surge Protector for installation
instructions.
7. Install RM (see "Installing Radio Modem" on page 20).
8. Install terminal block (see "Installing Terminal Block" on page 24).
9. Connect Alarm Output Module wires (see "Connecting Alarm Output Module Wires"
on page 27).
10. Check wiring.
Before you apply power to the system, review your wiring to make sure all
connections are correct and all wires firmly secured in the proper terminal.
11. Connect power to system.
Make sure the rest of your installation is complete before connecting power. In par-
ticular, make sure the antenna is connected to the RM before connecting power;
damage may occur if you operate without an antenna. Connect the battery cable
to B2 on the regulator circuit. Connect the solar panel cable to B1 on the reg-
ulator circuit.
12. Finalize the installation by programming and testing the AOM (see "Finalizing the
Installation" on page 28).
Page 10
Spread-Spectrum Radio Modem Installation Kit

Advertisement

loading