Setup, Adjustment And Operation; Setup - MK Diamond Products MK-212 Series Owner's Manual & Operating Instructions

Mk diamond mk-212 series tile saw - owner's manual & operating instructions
Table of Contents

Advertisement

SETUP, ADJUSTMENT and OPERATION

SETUP:

1. Pre-start Inspection:
Prior to beginning work, a pre-start inspection of the saw should be performed.
ON/OFF
Switch
(A)
Ensure the ON/OFF Switch is
in the OFF position
Inspect for
damage
(D)
Inspect the MK-212 for
damage – ensure the cord is
free of cracks or cuts
3. Water Pump Setup for Operation:
The Water Pump can be setup for operation in two ways, External Water Source or Re-circulation.
NOTE: If using a dry blade for operation, DO NOT connect the water pump.
I. External Water Source:
This is the preferred method of cooling.
Cooling
Transfer
Tube
(A)
Press the free end of the
Cooling Transfer Tube onto the
Blade Guard Cooling Port
MK-212
Inspect for
Off
Position
cracks or cuts
Inspect the Pump Assembly for
damage – ensure the cord is
free of cracks or cuts
Verify the Movable Cutting
Head moves freely
Press on
Connect the Water Pump to the
Revision 10/05, Effective Date October 4, 2005
(B)
Verify ease of
movement
(E)
Press to
Connect
(B)
MK-212
Inspect
the Blade
(C)
Inspect the Diamond Blade for
damage – verify the blade is
correct for the material being cut
Drain Plug
(C)
Remove the Drain plug
Page 16

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents