Installation Details; Wrench Torque Sheet For Installation; Connecting The Cables; Pipe Length And The Elevation - Toyotomi Kuro MTN A228DV Service Manual

Dc inverter split wall-mounted type air conditioner
Table of Contents

Advertisement

7. Installation details

7.1 Wrench torque sheet for installation

Ф6.35
Ф9.52
Ф12.7

7.2 Connecting the cables

The power cord of connect should be selected according to the following specifications sheet.

7.3 Pipe length and the elevation

Capacity
Btu/h
Gas
3/8'' (Ф9.52)
9k
1/2'' (Ф12.7)
12k
Caution:
Capacity is base on standard length and maximum allowance length is base of reliability.
Oil trap should be installed per 5-7 meters.

7.4 Air purging of the piping and indoor unit

Required tools:
Hexagonal wrench; adjustable wrench; torque wrenches, wrench to hold the joints and gas leak detector.
Note:
The air in the indoor unit and in the piping must be purged. If air remains in the refrigeration piping, it will affect
Outside diameter
mm
Unit
2
mm
Pipe size
Liquid
1/4'' (Ф6.35)
1/4'' (Ф6.35)
inch
1/4
3/8
1/2
Grade
9K
12K
1.5
1.5
Standard
Max.
length
Elevation
(m)
B (m)
5
5
5
5
Torque
Kgf.m
1.8
4.2
5.5
Max.
Additional
Length
refrigerant
A (m)
(g/m)
10
30
10
30
11

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Mtn a235dvMtg a235dv

Table of Contents