Download Print this page

GE ZV900SLSS User Manual page 5

Monogram glass canopy vent hoods

Advertisement

Remove Duct Covers to Access Main Control Board
The main control board is positioned on the lower
portion of the support structure. To access the control
board, duct covers must be removed on both models.
ZV900 Wall Mount Hood
• Remove the 2 screws at the top
of the upper duct cover. Slide
the upper duct cover down.
• Remove duct covers by lifting
straight up and off.
Set duct covers and
screws aside.
NOTE: Duct cover edges are
sharp. Do not tilt the duct
covers away from the hood,
they will scratch the wall
behind it.
ZV925 Island Hood
Use a small flat blade screwdriver to pop the top trim
strips out of the track on both sides.
Upper trim
strip
Side
bracket
Lower
trim strip
• Remove screw and duct holding bracket on each side.
• Press in on the lower trim strips to lift the hooks out of
the slots on the duct cover.
Reverse these steps to replace the duct covers.
Reach into the motor compartment and locate the
ON/OFF switch on the side of the motor. Press switch to
OFF position.
NOTE: Be careful
when removing
screws and duct
Upper
cover pieces. Do not
duct
cover
lose the cage nuts
on the inside pieces
of each duct piece.
• Remove 3 screws
Lower duct
cover
• Gently press in at
Control
board
• Remove 2 top screws. Slide
Upper
trim
strip
Lower
trim
strip
5
Front bottom duct cover section (snap into
place and secure with 6 screws – 3 per side)
on each side of the
bottom dust cover.
the side seams to
disengage the
front piece. Lift
front piece off,
then lift rear panel
off.
the duct covers down.
Remove 3 screws on each
side and lift off front piece
and then rear piece.
Plan
diagram
top view
Front bottom duct
cover sections
Control
Board

Advertisement

loading

This manual is also suitable for:

Zv925slss