Burner Installation - Thermo Pride PGT5-100 Installation And Service Manual

Table of Contents

Advertisement

All installations and services must be performed by qualified service personnel.
- COPPER TUBING SIZE FOR LIQUIFIED PETROLEUM GASES -
All black pipe sizes shown are I.D.
Seamless copper tubing may only be used with gases that are not corrosive to it. See note below and check with your
LP gas supplier before using. Seamless copper tubing must comply with standard type K or L for seamless copper
water tube, ASTM B 88; or seamless copper tube for air conditioning field service, ASTM B 280.
NOTE: Copper and brass tubing and fittings (except tin lined) shall not be used if the gas contains more than a trace
(0.3 grains per 100 cubic ft.) of hydrogen sulfide gas.
Maximum supply pressure for liquified petroleum (LP) gas is 14" wc and minimum supply for purpose of input
adjustment is 11" wc.
K. BURNER INSTALLATION
The power gas burner will mount on three stud mounting bolts on the lower mounting plate covering the opening in
the front of the heat exchanger. The end of the burner tube must be inserted no further than 1/4 inch back from the
inside surface of the combustion chamber to ensure proper operation and performance.
NOTE: OVERFIRE AIR TAP IS LOCATED ON LEFT SIDE OF FLAME INSPECTION COVER.
(TOP VIEW)
BURNER INSERTION
ILLUSTRATION (PGL)
11

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pgt11-125Pgt16-160Pgl37-312Pgl39-400Pgl20-180Pgl33-250

Table of Contents