B. Before servicing or cleaning unit, switch For Monogram local service in your area, power off at the service panel and lock service 1.800.444.1845. panel to prevent power from being switched on accidentally.
Design Information 36" Island Vent Hood Model This vent hood is designed to Model NOTE: Accessories to meet proper ZV850 be used in vented ceiling mounted ceiling height are required to complete Available installations. the installation. Required ZX858 – For 8 ft. ceiling height.
Use this chart to determine the Cover Accessories correct Duct Cover Accessory for 8 ft. to 10 ft. ceilings that must be ordered with the hood. ZV850SB Installation Heights ZV850 Duct Cover Dimensions 9-7/16" Vented Actual Installation * Possible Hood...
Installation Preparation 36" Island Vent Hood Duct Use this chart to Total compute maximum fittings Equivalent Quantity Equivalent permissable lengths Duct Piece Dimensions Length* Used Length for duct runs to Round, 1 ft. outdoors. straight (per foot length) This Hood Must Note: Do not exceed Use 6"...
Installation Preparation 36" Island Vent Hood Ceiling Plan the location Determine the exact location of the vent hood. Hood S tep • Use a plumb to check location to be sure Ducting countertop/cooktop location below the hood Centerline Advance will align exactly. •...
Page 8
Installation Preparation 36" Island Vent Hood Cross Framing • Arrange cross framing in the ceiling to suit the existing structure. See examples. S tep – Secure each 2 x 4 block with at least four (4), #10 wood screws, 3" long (minimum size Advance screws, not supplied).
Installation 36" Island Vent Hood The vent hood is packed separately from the required accessory ZX858, ZX859 or ZX8510. Step • Remove the frame, cover, parts box, side bars and packaging. Remove the • Remove junction box cover. Packaging • Install strain relief onto junction box cover. Locate the hardware accessory box packed with the hood and check contents.
Installation 36" Island Vent Hood • Align the template with the marks on the Step ceiling and tape in place. – Be sure the template is oriented correctly, with the front of the hood. Mount • Use a plumb to be sure the mounting holes Template will provide parallel alignment with the countertop below.
Installation 36" Island Vent Hood Step Wiring Ceiling • Route house wiring through the ceiling hole and pull a length to reach the hood junction box, approximately 6" below the support. Front Side • Tape the wire to the front of the frame Secure support to prevent damage during Wiring...
Installation 36" Island Vent Hood Step Top Duct Cover Install Screw on Pretap Each Side 2 Screw Install Holes Bottom Duct Cover Decorative Top Duct Bottom Duct Cover Cover Duct Covers Top Duct Cover Stop Screw Install Stop Screw in One of 3 Holes •...
Installation 36" Island Vent Hood Bottom Align Duct Duct Connector to Align Cover S tep House Duct Mounting Stop Screw Studs Install Install 4 lock washer Hood and 4 Nuts Note: TWO PEOPLE ARE REQUIRED TO • Check hood level in both directions. COMPLETE THIS INSTALLATION! •...
Installation 36" Island Vent Hood Step Slide Duct Cover Down, Install Side Utility Bars • Hold the decorative duct cover and • Install the side utility bars with screws remove the temporary stop screw. Return as shown. the screw to the service manual envelope for future use.
Installation 36" Island Vent Hood Step Install Lower Filter Filters Slots • Remove protective film on filters. • Tip the filter into the lower slots at the rear of the opening. Lift the filter and pull the knob forward until the filter rests on the slots.
Page 16
NOTE: While performing installations described in this book, safety glasses or goggles should be worn. For Monogram local service in your area, call 1.800.444.1845. NOTE: Product improvement is a continuing endeavor at General Electric. Therefore, materials, appearance and specifications are subject to change without notice.
Need help?
Do you have a question about the ZV850 and is the answer not in the manual?
Questions and answers