IDEAL BUC5034 Nstallation, Assembly And Servicing page 9

Combination boiler
Table of Contents

Advertisement

1 Package IC1, IC2, IC3
À
Â
2
1
2
1
Assembling the base and draining tube
1.
Lay a sheet of paper in front of the boiler body, take the
boiler body off the pallet and place it standing on the furnace
door.
2.
Remove the adjustable feet assembled on the base and
replace them with the four protective plastic plugs supplied
in connection kit package BH 46.
Buccaneer GT, Falcon GTE
ASSEMBLY
BUC5010
2
1
2
1
7+#
- Installation, Assembly & Servicing
Á
Ã
3.
Unscrew
/
" plastic plug A from the rear section of the boiler
1
2
body.
Fit the base onto the feet of the boiler and clip it onto the
rear section.
4.
Screw the draining pipe onto the rear section. Make the
connection watertight with hemp or filler.
5.
Set the boiler body on its feet.
A
7+#
7+#!
9

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents