Mitsubishi Electric PLH-2 Installation Manual page 12

Air-conditioners
Hide thumbs Also See for PLH-2:
Table of Contents

Advertisement

690~710
25~35
117
186
J
I
12
H
760
G
25~35
F
640
117
E
662
J
I
4. Installing the indoor unit
E
4.2. Ceiling Openings and Suspension
Bolt Installation Locations
Using the accompanying installation template and gauge, install the
main unit in such a way that the opening on ceiling falls at the place
shown in following diagram (usage method of template and gauge is
shown printed on them, respectively).
* Before using, check the dimensions of template and gauge, because
they change due to fluctuations of temperature and humidity.
* The dimensions of ceiling opening can be regulated within the range
shown in following diagram; so center the main unit against the open-
ing of ceiling, ensuring that the respective opposite sides on all sides
of the clearance between them becomes identical.
Use M10 (3/8") suspension bolts.
* Suspension bolts are to be procured at the field.
Install securely, ensuring that there is no clearance between the ceil-
ing panel & grille, and between the main unit & grille.
4.2. Ceiling Openings and Suspension
Bolt Installation Locations
In case of installing the optional high efficiency filter element (filter case-
ment), the dimension between transom and ceiling shall be more than
440 mm.
<Installation of optional high efficiency filter element (filter casement)>
E Outer side of main unit
F Suspension bolt pitch
G Ceiling opening
H Outer side of Grille
I Grille
J Ceiling panel
*
Note that the space between ceiling panel of the unit and ceiling slab and etc
must be 10 to 15 mm to be left.

Advertisement

Table of Contents
loading

This manual is also suitable for:

2.5kkcMr.slim plh-2kkcMr.slim plh-2.5kkc

Table of Contents