Preheat And Dhw Function - Worcester GREENSTAR 24i junior Instruction Manual

Wall hung rsf gas fired condensing combination boiler for sealed central heating systems and mains fed domestic hot water
Table of Contents

Advertisement

FAULT FINDING
& DIAGRAMS
Tap open
(recognised
by flow
turbine)
POWER
BLUE
SWITCH
LIGHT
ECO button
ON
ON
not
illuminated *
(ie preheat
requested)
AND
20 minutes
since last pre-
heat demand
AND
temperature
at least 10°
below set
point.
*Set by pressing and holding
ECO button for 3 seconds.
If programmer is fitted this is
set by a combination of
programmer (DHW) demand
and ECO button.
Wait
Gas valve OFF.
5 seconds
DOMESTIC
HOT
WATER
DEMAND
(priority over
all other
demands)
Diverter valve
Fan to
in DHW
start
position
speed.
Pump ON.
IGNITION SEQUENCE
PREHEAT
DEMAND
Spark
ignition
4 seconds
NO
YES
5th
LOCKOUT
attempt?
Burner shut down if
primary temperature
94°C
(until 84°C)
Over temperature shut-
down if water tempera-
ture is 8°C above set
value.
Fan (& gas)
modulation
to achieve
set
temperature
(40-60°C)
GREEN
IGNITION
FLAME
SEQUENCE
LIGHT
(see detail)
ON
Fan (& gas)
modulation
to achieve
(55°C)
YES
BURNER
LIT?
NO
Stop spark.
Wait
10 seconds
DEMAND
END
Gas valve
OFF
Pump run 3
minutes
Fan run 30
seconds
DEMAND
END
Gas valve
OFF
Stop pump
Stop fan

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Greenstar 28i junior

Table of Contents