Pipe Work
It is essential that the pipe work connecting to and from the heater
has a minimum bore (internal diameter) of 1¼" (32mm). To assist correct air
purging and to ensure the heater remains completely full of water during
operation, the return pipe which carries the water back to the pool must
incorporate a safety loop or 'kick-up' in the pipe as close as possible to the
heater (see fi g 4)
NOTE: When coupling to a fl exible pipe a safety loop can simply be
created by routing the pipe up and over an obstacle. Remember to
use pipe clips to securely fasten all hose connections.
Weather Protection
The heater must be installed within a dry weather proof enclosure.
Caution! If the heater is not used during winter months it must be drained to
prevent frost damage.
Electrical Connection
The heater must be installed in accordance with the country / regional
requirements & regula-tions. In any event the work must be carried out
by a qualifi ed electrician who will provide a certifi cate of conformity
upon completion of the work. The power supply must be fi tted with a
RCD.
Remove Top Access Cover
to make the electrical
connections
(Qualifi ed electricians only)
Fig 5.
4
www.elecro.co.uk
Need help?
Do you have a question about the FLOW-LINE and is the answer not in the manual?
Questions and answers