Rohs Compliance Statement - Elecro Engineering FLOW-LINE Installation & Operating Manual

Flow-line pool heater
Hide thumbs Also See for FLOW-LINE:
Table of Contents

Advertisement

RoHS Compliance Statement

Elecro Engineering Limited certify that our Electric Swimming Pool Heater
Range complies in accordance with RoHS Directive 2002/95/EC on the
restriction of hazardous substances.
Waste of Electrical / Electronic Equipment
This product complies with EU directive 2002/96/EC
Do Not dispose of this product as unsorted municipal waste.
This symbol on the product or on it's packaging indicates that this product
should not be treated as household waste. Instead it should be handed
over to the applicable collection point for the recycling of electrical and
electronic equipment.
10
By ensuring this product is disposed of correctly you will
help prevent potential negative consequences for the
environment and human health, which could otherwise be
caused by inappropriate waste handling of this product.
The recycling of materials will help to conserve natural
resources.
For more information please contact your local Civic offi ce,
your household waste disposal service or the retailer
where you purchased the product.
www.elecro.co.uk

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the FLOW-LINE and is the answer not in the manual?

Questions and answers

Related Products for Elecro Engineering FLOW-LINE

Table of Contents