Installing The Mvp-Wds In A Cb-Mvpwds Rough-In Box - AMX Wall Docking Station MVP-WDS Installation Manual

Wall docking station
Table of Contents

Advertisement

MVP-WDS Wall Docking Station & CB-MVPWDS Rough-In Box

Installing the MVP-WDS in a CB-MVPWDS Rough-In Box

1. Connect the 2-pin power connector and USB cables to the WDS. The WDS must be installed with
these attached. The USB connectors can be from either a USB extension cable, or a wireless USB
RF transmitter.
Verify that the terminal end of the power cable is not connected to a power source
before plugging in the 2-pin power connector.
2. Insert the WDS into the rough-in box, so that the Mounting Tabs on the WDS lie flush against the
rough-in box (FIG. 9).
#6-32 Mounting Screws (4 - not included)
secure the WDS to the Rough-In Box
See CAUTION after Step 3 below
#6-32 Faceplate
Security Screws (2)
Die Cut Foam
covers (2)
FIG. 9
MVP-WDS installation configuration within a CB-MVPWDS Rough-In Box
The MVP-WDS must be mounted on a flat surface.
8
The rough-in box must be mounted prior to continuing this section. Refer to the Installing the
CB-MVPWDS Rough-In Box section on page 4 for detailed pre-wall installation instructions.
The faceplate must be removed prior to any surface installation (see the Removing the MVP-
WDS Faceplate section on page 5).
Verify that the USB and power cables have been threaded through the knockouts on the right
of the rough-in box. Leave enough slack in the wiring to accommodate re-positioning of the
panel.
Faceplate
Mounting Tab
MVP-WDS (Main unit)
MVP-WDS Wall Docking Station for MVP Panels
CB-MVPWDS
Rough-In Box

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Mvp-wds

Table of Contents

Save PDF