Visit www.carrier.com
NOTE: Read the entire instruction manual before starting the
installation.
INTRODUCTION ..........................................................................2
Check Equipment......................................................................2
IDENTIFY UNIT ................................................................2
ROOF CURB.......................................................................2
SLAB MOUNT ...................................................................2
GROUND MOUNT ............................................................2
INSPECTION ......................................................................2
INSTALLATION ................................................................3
CONNECTING GROUND LEAD TO GROUND LUG ..9
PRE-START-UP ............................................................................9
START-UP ...................................................................................10
CHARGE ...........................................................................12
NO CHARGE ....................................................................12
MENTS ..............................................................................13
MAINTENANCE.........................................................................14
Air Filter..................................................................................16
Outdoor fan .............................................................................16
Indoor airflow .........................................................................17
Metering device ......................................................................18
Manufacturer reserves the right to discontinue, or change at any time, specifications or designs without notice and without incurring obligations.
Book 1 4
PC 101
Tab 6 8
Installation, Start-Up,
and Service Instructions
Printed in U.S.A.
Catalog No. 50SZ-1SI
Single-Packaged Heat Pump Units
Fig. 1-Model 50SZ
High Flow Valves...................................................................18
Time-delay relay .....................................................................18
TROUBLESHOOTING ...............................................................18
NOTE TO INSTALLER - READ THESE INSTRUCTIONS
CAREFULLY AND COMPLETELY before installing this unit.
Also, make sure the Owner's Manual and Service Instructions are
left with the unit after installation.
SAFETY CONSIDERATIONS
Installation and servicing of air-conditioning equipment can be
hazardous due to system pressure and electrical components. Only
trained and qualified personnel should install, repair, or service
air-conditioning equipment.
Untrained personnel can perform basic maintenance functions of
cleaning coils and filters. All other operations should be performed
by trained service personnel. When working on air-conditioning
equipment, observe precautions in the literature, tags, and labels
attached to the unit, and other safety precautions that may apply.
Follow all safety codes. Wear safety glasses and work gloves. Use
quenching cloth for unbrazing operations. Have fire extinguisher
available for all brazing operations.
Pg 1
50SZ
C99001
8-05
Replaces: New