Bolting the Outdoor Unit to the Platform
Figure 33: Bolting the Outdoor Unit to the Platform.
LUU187, 247HV Outdoor Unit.
Table 31: Outdoor Unit Foundation Specifications.
Outdoor Unit
Bolt Type
LUU187HV,
M10-J
LUU247HV
Minimum 7-7/8 inches
LUU367HV
M10-J
LUU427HV
Bolting the Outdoor Unit to the Platform Procedure
When installing the outdoor unit onto a concrete or rigid mount, use
a bolt and nut.
1. Ensure that the concrete platform will not degrade easily, and has
enough strength to bear the weight of the unit.
2. Include an H-beam support. Firmly attach the corners, otherwise
the support will bend.
3. Use a hexagon nut.
4. Use anti-vibration material.
5. Include enough space around the concrete foundation for con-
densate drainage.
6. Seal all wiring and piping access holes to prevent bugs from
entering the unit.
Concrete Platform Specifications
• Concrete foundations should be made of one part cement, two
parts sand, and four parts gravel.
• The surface of the foundation should be finished with mortar with
rounded edges, and weatherproofed.
• All referenced materials are to be field-supplied.
• Images are not to scale.
Concrete Height
Bolt Depth
Minimum 2-3/4 inches
Minimum 2-3/4 inches
Due to our policy of continuous product innovation, some specifications may change without notification.
©LG Electronics U.S.A., Inc., Englewood Cliffs, NJ. All rights reserved. "LG" is a registered trademark of LG Corp.
PlaCement ConSiDerationS
Figure 32: Platform Mounting.
Bolt and
Anti-vibration
Pad Placement
Foundation
Figure 31: Close up of Bolt Attachment.
Anchor Bolt
M10
LUU367, 427HV Outdoor Unit.
Top of Outdoor Unit
(Looking Down)
Four-Way caSSette | 49
outdoor unit
Unit: Inch
Refrigerant Piping
Connection Location
13/16
Unit: Inch