CITROEN C2 2003 Handbook page 81

Table of Contents

Advertisement

CHECKING AND SETTING THE VALVE TIMING
Engine : 8HY
Checks (continued).
Refit :
- The engine support (7), tighten to 1,5 ± 0,4 m.daN.
- The engine support (4), tighten to 6,1 ± 0,6 m.daN.
- The engine support (5), tighten to 6 ± 0,6 m.daN.
- The electrical harness (6).
Couple:
- The exhaust line, tighten the collar to : 2,5 ± 0,3 m daN
- The fuel supply unions (1).
- The air/air heat exchanger inlet/outlet pipes (3).
Connect the connector (2).
Refit :
- The accessories belt (see corresponding operation).
- The front RH splash-shield (see corresponding operation).
- The front RH road wheel, tighten to 9 ± 1 m.daN.
Reconnect the battery.
B1BP2N0C
79

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents