Mitsubishi Electric Mr.Slim PUHZ-SHW80VHA Service Manual page 98

Split-type, heat pump air conditioners
Hide thumbs Also See for Mr.Slim PUHZ-SHW80VHA:
Table of Contents

Advertisement

OPERATING PROCEDURE
11. Removing the reactor (DCL) and capacitor (CB)
(1) Remove the service panel. (See Photo 1)
(2) Remove the top panel. (See Photo 1)
(3) Remove the electrical parts box. (See Photo 3)
[Removing the reactor]
(4) Remove 4 reactor fixing screws (4 × 10) and remove the
reactor.
[Removing the capacitor]
(4) Remove 4 capacitor band fixing screws (4 × 10) and
remove the capacitor.
w The reactor and capacitor are attached to the rear of the
electrical parts box.
12. Removing the compressor (MC)
(1) Remove the service panel. (See Photo 1)
(2) Remove the top panel. (See Photo 1)
(3) Remove 2 front cover panel fixing screws (5 × 12) and
remove the front cover panel. (See Photo 3)
(4) Remove 2 back cover panel fixing screws (5 × 12) and
remove the back cover panel.
(5) Remove the electrical parts box. (See Photo 3)
(6) Remove 3 valve bed fixing screws (4 × 10) and 4 ball valve
and stop valve fixing screws (5 × 16) then remove the valve
bed.
(7) Remove 3 right side panel fixing screws (5 × 12) in the
rear of the unit then remove the right side panel.
(8) Remove 3 separator fixing screws (4 × 10) and remove
the separator.
(9) Remove the soundproof cover for compressor.
(10) Remove the terminal cover and remove the compressor
lead wire.
(11) Recover refrigerant.
(12) Remove the 3 points of the compressor fixing nut using
a spanner or a adjustable wrench.
(13) Remove the welded pipe of compressor inlet and outlet
then remove the compressor.
Note: Recover refrigerant without spreading it in the air.
OCH526
PHOTOS
Photo 8
Reactor
(DCL)
Reactor
fixing
screws
Capacitor (CB)
Photo 9
Separator
Valve bed
Compressor (MC)
Compressor fixing nut
98
Electrical parts box
Reactor
fixing
screws
Capacitor band
fixing screws
Power receiver

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents