Downflow Instructions - Haier AC-8888-107 Service Manual

Commercial air conditioner
Table of Contents

Advertisement

DOWNFLOW INSTRUCTIONS

Important: Read instructions below carefully
1.Before putting the Air Handler in the downflow
position, remove the three access panels and remove
the metal coil retaining bracket and filter
Then remove the horizontal and vertical
The horizontal pan is not required for
application
2.After removing the coil, turn the Air Handler to the
downflow position and relocate the (8) brackets
which include (1) tie bracket (1) rear channel
(2) zee coil supports, (2) stiffener brackets, and (2) 3" 2
flat insulation retaining brackets. In effect, brackets, coil,
and 2 lower access panels will be assembled 180
degrees from their former position and shifted down
with return in up position
3. Assemble drain pan insulation kit to the bottom of
the drain pan to prevent drain pan from sweating during
operation.
4. Place 3" flat insulation retainer on the bottom of
each coil slab against the aluminum fins as shown in
Fig.3. This will reduce the potential for water blow-off
into the air stream.
5. Slide the coil assembly into Air Handler and
reattach the metal coil retainer bracket to tie
bracket. See Fig.2. Then reattach the upper access
panel followed by the two lower access panels to match
the tubing and drains.
6. A 4" to 3" removable panel is recommended at
the point where the duct meets with the return part of
the
Air
Handler
removal of coils that are too tall.
7. The "HB" coils are shipped with a check flowrator
section which is accessible from the outside of the unit.
WARNING: The "A" coil contains 150 p.s.i.g. of air pressure
Before setting up flowrator assembly for field brazing see page 12 or read the Warning
label on the lower access panel.
REFRIGERANT TUBING
Refrigerant tubing should be installed as to avoid undue stress. They must be supported or
routed to avoid strain or vibration. To avoid damage that can be caused by condensate,
insulate the suction tube with a closed cell insulation with the seams sealed. The insulation
should terminate at the tubing entrance to the air handler. Do not reduce the recommended
tubing size.
CONDENSATE REMOVAL
28
Commercial Air Conditioner
close off.
drain pans.
downfolw
bracket,
as shown in fig.1 and fig.2.
unit
to
allow
Model: heat pump, 10SEER UNITS
easier
for use with either cooling or heat pump outdoor
Fig.8-7

Advertisement

Table of Contents
loading

Table of Contents