Connections - Plumbing - Rheem Optima Owner's Manual And Installation Instructions

Domestic
Table of Contents

Advertisement

CONNECTIONS – PLUMBING
CONNECTION SIZES
Hot water connection:
Cold water connection:
Relief valve connection:
All plumbing work must be carried out by a qualified person and in accordance
with the Plumbing Standard AS/NZS 3500.4 and local authority requirements.
WATER INLET AND OUTLET
All pipe work must be cleared of foreign matter before connection and purged
before attempting to operate the water heater. All olive compression fittings
must use brass or copper olives. Use thread sealing tape or approved thread
sealant on all fittings.
An isolation valve and non-return
valve must be installed on the cold
water line to the water heater. An
acceptable arrangement is shown in
the diagram. Refer also to
Water Delivery"
on page 21 and to
"Mains Water Supply"
A disconnection union must always
be provided at the cold water inlet
and hot water outlet on the water
heater to allow for disconnection of
the water heater.
This water heater has either a
plastic dip tube or fitting liner in the
inlet
and
outlet
diagram). These must be in place
for the water heater to function
properly. Do not remove or damage
them by using heat nearby. They
will be pushed into the correct
position as the fitting is screwed in.
"Hot
on page 19.
fittings
(see
27
Optima
RP ¾/20
RP ¾/20
RP ½/15



Advertisement

Table of Contents
loading

Table of Contents