Test Setups And Results; Test Setup For Measuring Boost Charger Efficiency - Texas Instruments bq25505 User Manual

Battery charger evaluation module for energy harvesting
Table of Contents

Advertisement

Test and Measurement Summary
3.1

Test Setups and Results

3.1.1
Boost Charger Efficiency
The test setup is shown in
Figure 4
is listed below:
1. VIN_DC was connected to a Keithley 2420 source-meter configured as a current source with voltage
compliance (clamp) set to the open circuit voltage.
2. VSTOR was connected a Keithley 2420 source-meter configured as a voltage source set to the
VSTOR voltage. The current sunk by the source-meter was the output current of the charger.
3. VREF_SAMP was connected to a power supply configured to output the desired input voltage
regulation point (that is, the MPPT% times the HiZ source's VOC). No jumper is required on JP4.
configured
as current
Figure 2. Test Setup for Measuring Boost Charger Efficiency
8
User's Guide for bq25505 Battery Charger Evaluation Module for Energy
Harvesting
BAT+
R1
GND
Figure
2. The specific equipment used for the test results in
SM1
SM1
Source
+
meter
source
-
Copyright © 2013, Texas Instruments Incorporated
D1
C
A
SM2
SM2
Source (Sink)
meter
+
configured
-
as voltage
source
+
-
- +
Power Supply set to
desired input voltage
regulation point
(that is, MPPT% × VOC)
www.ti.com
Figure 3
and
SLUUAA8 – September 2013
Submit Documentation Feedback

Advertisement

Table of Contents
loading

Table of Contents