Burner & Tube Installation; Straight Tube System - Schwank S100 Installation & Owner's Manual

Low intensity tube type infrared heaters
Hide thumbs Also See for S100:
Table of Contents

Advertisement

9 INSTALLATION OF HANGERS, TUBES AND BURNER

STRAIGHT TUBE SYSTEM

9.1 S100 / ITB
Note: The turbulator for the 175,000 LP heater must always be in the 5th tube.
Turbulators for all other inputs are ALWAYS installed at the vent end of the heater.
1) Install Hangers:
i: No closer than 3" (5 CM) and no further than 5" (10 cm) from the burner/tube flange
ii: No closer than 6" (15 cm) either side of a tube connection in the system
iii: No further than 24" (61 cm) either side of a tube connection in the system
2) With all hangers in alignment and suspended at the same height, insert first aluminized tube
section, through 4" hole into first two wire hangers.
NOTE: INSTALL THE FIRST AND SECOND TUBES (FROM BURNER END) WITH THE WELDED SEAM
ALONG THE TUBE LENGTH FACING DOWNWARD
3) Bolt burner to flange on first tube section,
IMPORTANT NOTE: Models with inputs 100,000, 175,000 & 200,000 refer to section 9.3
4) Slide a Torctite tube coupler over the swaged end of the first tube, then join the second tube
over the swage in the first tube
5) Slide the Torctite coupler into position across the center of the joint -
6) IMPORTANT: TOURQUE THE COUPLER BOLTS TO 40 ft-lbs
7) Subsequent lengths of tube can then be installed, by joining them together swaged portion
inside the next tube and locking the joints using the Torctite coupler.
FIGURE 7 STRAIGHT TUBE TYPICAL HANGER & SUPPORT SPACINGS
SUSPEND ALL TUBES BY TWO (2) HANGERS PER 10' LENGTH, LOCATED BETWEEN 6"
to 24" FROM EACH TUBE CONNECTION.
INSTALL FIRST AND SECOND TUBES (FROM BURNER END) WITH WELDED SEAM FAC-
ING DOWNWARD.
1 - END CAP
2 - WIRE HANGER
3 - BURNER ASSEMBLY
4 - COMBUSTION AIR OPTIONS:
4A - JS-0532-SE 4" INTAKE
ADAPTER
~ BURNER AND TUBE INSTALLATION
SEE FIGURE 8
4B - JS-0532-VC 4" WALL CAP
4C - JA-0528-XX 4" ROOF CAP
5 - SIGHT GLASS
6 - ALUMINIZED TUBE WITH
FLANGE
7 - TORCTITE TUBE COUPLER
15
.
SEE FIGURE 9
SEE FIGURE 9.
8 - STEEL TUBE(S)
9 - REFLECTOR
10 - FLUE VENT TERMINAL
11 - BURNER SUPPORT CHAIN
12 - HANGER SUPPORT
CHAINS
S100/ITB I&O Manual
IM101230
RD: JAN 2012
RL: 6B- BA