D-Link DES-1048 Unmanaged Layer 2 Ethernet Switch
Mounting the Switch in a Standard 19" Rack
Figure 2-3. Installing Switch in a rack
Power On
Plug one end of the AC power cord into the power connector of the Switch and the other end into the local power
source outlet.
After the Switch is powered on, the LED indicators will momentarily blink. This blinking of the LED indicators
represents a reset of the system.
Power Failure
As a precaution, in the event of a power failure, unplug the Switch. When power is resumed, plug the Switch
back
in.
7