PORTSMOUTH
DECK MOUNT
BATH FILLER
Thank you for selecting American-Standard...
the benchmark of fine quality for over 100 years.
To ensure that your installation proceeds smoothly--
please read these instructions carefully before you begin.
Recommended Tools
Flat Blade Screwdriver
Adjustable Wrench
Channel Locks
*Supplied with Fitting
1
SPOUT ASSEMBLY
Install RUBBER RING (1) into recess of spout base.
Insert SPOUT SHANK (2) through center hole of MOUNTING LEDGE.
Make sure that the RUBBER RING (1) is properly seated in RECESS
of SPOUT BASE.
Assemble RUBBER WASHER (3) and BRASS WASHER (4) onto
SHANK (2). From underside of ledge secure SPOUT (6) into position
with LOCKNUT (5).
2
3
5
Installation
Instructions
™
ROUGHING-IN DIMENSIONS
Tubing Cutter
*Wrench
*Hex key
Turn off hot and cold water
CAUTION
supplies before beginning.
6
RECESS
1
4
7420.900
7420.901
Series
7420.920
7420.921
Series
7-7/8"
(199mm)
3-3/16"
(81mm)
7-7/8"
(200mm)
4-7/8"
(125mm)
MOUNTING
SURFACE
1-1/8 D.
2-5/8" D.
(66mm) D.
1-3/16" MAX.
(30mm) MAX.
3/4-14 MALE
N.P .T. INLETS
2
PREPARE TUBE AND TEE ASSEMBLY
Prepare TUBE and TEE ASSEMBLY (1) to fit center to center
VALVE (2) location (between 6-1/2" and 12"). If necessary,
cut and/or bend TUBING carefully. Make sure tube bend is
close to the TEE (1) so that it will not effect the compression
joint at the VALVE CONNECTION.
Remove COUPLING NUT (3) and FERRULE (4) from each
VALVE (2) and slide onto TUBING (5).
MOUNTING
SURFACE
Certified to comply with ANSI A112.18.1M
2-7/8"
(73mm)
CROSS HANDLE
6-1/2" to 12"
(165mm to 305mm)
2-1/4" D.
(56mm) D.
LEVER
HANDLE
(C)
(H)
12 MAX.
1-1/16 D.
(305mm)
(27mm) D.
4
3
6-1/2" to 12"
(165mm to 305mm)
M 9 6 5 0 2 7 R E V. 1. 6
8-1/4"
(210mm)
2-1/16" D.
(52mm) D.
3'
(76mm)
1-1/2 MAX.
(38mm) MAX.
1-3/16 D.
(30mm) D.
1
5
3
4
MOUNTING
SURFACE
2
NOTE
VALVE inlet is
3/4-inch NPT male.