HANDSHOWER INSTALLATION (For 2064.901 only)
Drop SPRAY ESCUTCHEON (1) through the fourth hole of the tub ledge (12" max from SPOUT
center) with SPRAY ESCUTCHEON (1) directed towards tub center. Be sure RUBBER RING (2)
is properly seated in SPRAY ESCUTCHEON (1). Install RUBBER WASHER (3), BRASS WASHER (4)
and LOCKNUT (5) from underside of ledge.
Secure SPRAY ESCUTCHEON (1) by tightening LOCKNUT (5).
Install SEAL (9) and connect HOSE (10) to outlet nipple at the bottom of TEE (7). Tighten firmly.
Slip SHOWER HOSE (8) with COUPLING NUT through SPRAY
HOLDER (6) and SPRAY ESCUTCHEON (1). Note: SPRAY
HOLDER (6) must be seperate from ESCUTCHEON (1) to
pass HOSE (8) through ESCUTCHEON.(1)
Insert SEAL (9) into SHOWER HOSE (8). Connect HOSE (8)
to HOSE (10).
Install SEAL (9) and connect HAND SHOWER (11) to
SPRAY HOSE (8).
When not in use, HANDSHOWER should be seated
NOTE
in the HOLDER.
7

MAKE WATER SUPPLY CONNECTIONS

Connect HOT water supply to LEFT INLET
UNION (1) and COLD water supply to
RIGHT INLET UNION (2). Pipe connections
are 3/4" NPT. Use sealant or Teflon tape
on pipe connections.
Do not solder directly to valve body.
7A

TEST INSTALLED FAUCET

With HANDLES in OFF position, turn on
WATER SUPPLIES and check all connections
for leaks.
Operate both HANDLES to flush water lines
thoroughly.
Lift HAND SHOWER from HOLDER, direct spray
into tub. Lift TRANSFER KNOB to check HAND
SHOWER and HOSES for leaks.
Turn handles "off" and replace HAND SHOWER.
8
Before the bathroom is completely finished, you may
want to remove spout, handshower, and handles to
avoid damage during construction.
To remove handles, reverse steps in section 4.
To remove SPOUT (1), proceed as follows:
Unthread LIFT ROD KNOB (2) and remove.
Remove PLUG BUTTON (3) and remove SET SCREW (4) using
4mm hex wrench supplied.
Lift SPOUT (1) off SHANK (5) carefully and remove RUBBER
RING (6).
Unthread SHANK SLEEVE (7) and remove from SHANK (5).
Reverse sequence to re-install SPOUT (1). Be sure RUBBER
RING (6) is properly seated in its recess at the base of the
SPOUT (1). Make certain SET SCREW (4) is properly aligned
and tight so that SPOUT (1) is locked in place.
9

CARE INSTRUCTIONS:

DO: SIMPLY RINSE THE PRODUCT CLEAN WITH CLEAR WATER. DRY WITH A SOFT COTTON FLANNEL CLOTH.
DO NOT: DO NOT CLEAN THE PRODUCT WITH SOAPS, ACID, POLISH, ABRASIVES, HARSH CLEANERS, OR A
CLOTH WITH A COARSE SURFACE.
7
9
TRANSFER KNOB
HOT
1
3/4" X 3/4" NPT UNION
(NOT SUPPLIED)
IMPORTANT: It is strongly recommended that access be
3/4" NPT
provided for all enclosed mechanical parts to this system.
1
6
9
10
8
HAND
SHOWER
COLD
2
3/4" NPT
2
VIEW "A"
3
4
Hex wench
(supplied)
7
5
11
9
6
1
2
3
4
5
VIEW "A"
M 9 6 5 0 2 7 R E V. 1. 6

Advertisement

loading

This manual is also suitable for:

Portsmouthtm 7420.901Portsmouthtm 7420.92Portsmouthtm 7420.921Portsmouth 7420.900 seriesPortsmouth 7420.901 seriesPortsmouth 7420.92 series ... Show all