Summary of Contents for Arrow Group Industries OB1014-C1
Page 1
Owner's Manual & Assembly Instructions SP01 Model No. CM1014-A1 OB1014-C1 697.68103-C1 697.68104 CAUTION: SOME PARTS HAVE SHARP EDGES. CARE MUST BE TAKEN WHEN HANDLING THE VARIOUS PIECES TO AVOID A MISHAP. FOR SAFETY SAKE, PLEASE READ 714740408 SAFETY INFORMATION PROVIDED IN THIS MANUAL BEFORE BEGINNING CONSTRUCTION.
Page 2
The parts list is located on page 12. •If you find that a part is missing, include the model number of your building and contact: Arrow Group Industries, Inc. Customer Service Department Route 50 East...
Page 3
PLAN AHEAD..Watch the Weather: Be sure the day you select to install your building is dry and calm. Do not attempt to assemble your building on a windy day. Be careful on wet or muddy ground. Teamwork: Whenever possible, two or more people should work together to assemble your building.
Page 4
SAFETY FIRST..Safety precautions are important to follow throughout the construction of your building. •Care must be taken when handling various •Practice caution with the tools being used in the pieces of your building since some contain assembly of this building. Be familiar with the sharp edges.
Page 5
CARE & MAINTENANCE..A5 Web Finish: For long lasting finish, periodically clean and wax the exterior surface. Touch- up scratches as soon as you notice them on your unit. Immediately clean the area with a wire brush; wash it and apply touch-up paint per manufacturer's recommendation. Roof: Keep roof clear of leaves and snow with long handled, soft-bristled broom.
Page 6
ACCESSORIES..A6 WEB ROOF STRENGTHENING FLOOR FRAME KITS (heavy snow load) KITS Extra roof beams and gable braces designed for added protection against heavy snow accumulation. Increases the strength of your roof by 50%. ANCHOR KITS Model No. AK4 MODELS FB47410, FB5465, FB106-A Anchor Kit contains heavy-duty steel FB109-A and FB1014-A augers, 60' (18m) of steel cable and 4 cable...
Page 9
Foundation The Foundation For Your Building OPTION 1: ARROW FLOOR FRAME KIT: (Order No. FB1014-A or 68387-A) Arrow has the best base for your building in this simple kit. It keeps stored items above the ground. This kit should be used with one of the following: A.
Page 10
Anchoring Anchoring Down The Building It is important that the entire floor frame be anchored after the building is erected. Below are recommended ways of anchoring. Anchoring into Wood/Post: Arrow Anchoring Kit: (Model No. AK4 or 60298) Use 1/4" Wood Screws. There are 1/4" (0,63cm) dia. Recommended for use with any suggested base.
Page 11
Hardware SP11 Remove from bag of screws and save for the last step 65900A 65103 #10Bx1/2" Black Screw (8) 65923 65004 #8-32 Hex Nut (192) #8-32x3/8" Bolt (192) #8Ax5/16" Screw (438) (Packed with Screws) 65109 67468 66646 #8-32 Acorn Nut (4) Peak Cap (2) 66045 Washer (453)
Parts List BZ12 Part Part Quantity Check Number Description in Carton List 8576 Right Gable 8577 Left Gable 10497 Horizontal Door Brace 7743 Roof Panel 9984 Right Roof Panel 9983 Left Roof Panel 10475 Right Door 10475 Left Door 9369 Door Jamb 9373 Front Wall Panel...
● Parts Needed For ● ● ● ● ● ● 10386 Roof Beam (8) Step 3 Roof Beam Assemblies SO16 The roof beams join the two gables 10386 and support the roof panels. The main roof beam is made up of four pieces overlapped back to back at the cen- 10386 ter.
● Parts Needed For ● ● ● ● ● ● 6403 Door Track Splice (1) Step 4 ● ● ● ● ● 9366 Door Track (2) Door Track Assembly NOTE: Door Track Splice (painted part) The door track assembly supports the sliding doors and reinforces the front wall.
Page 18
● ● ● ● ● Front Floor Assembly (1) ● Parts Needed For ● Step 5 ● ● ● ● ● Side Floor Assembly (2) Floor Frame ● ● ● ● ● Rear Floor Assembly (1) SO18 RIGHT REAR 10387 STEP Place the floor frame pieces that 8936...
Page 19
● Parts Needed For ● ● ● ● ● ● 6515 Wall Panel (2) Step 6 ● ● ● ● ● 9373 Front Wall Panel (2) Corners ● ● ● ● ● 6020 Corner Panel (4) SO19 Narrow NOTE Side The remainder of the building assembly 6020 requires many hours and more than one...
● Parts Needed For ● Step 7 ● ● ● ● ● Rear Wall Channel Assembly (1) ● ● ● ● ● Side Wall Channel Assembly (2) Mid Frames SO20 The mid frame pieces give rigidity to the side and rear walls. Fasten the rear wall channel across the middle of the rear wall using screws.
● ● ● ● ● Door Track Assembly (1) ● Parts Needed For ● Step 8 ● ● ● ● ● Rear Wall Angle Assembly (1) Top Frames ● ● ● ● ● Side Wall Angle Assembly (2) SO21 The top frame pieces give rigidity to the walls and provide a surface for attaching the gables which support the roof.
● Parts Needed For ● Step 9 ● ● ● ● ● 6515 Wall Panel (10) Wall Panels SO22 STEP Each wall panel has a crimped rib on one side. The crimped rib should go under the rib of the panel that follows Crimped Rib STEP Underneath...
Page 23
● Parts Needed For ● ● ● ● ● ● 9369 Door Jamb (2) Step 10 ● ● ● ● ● 9365 Front Wall Channel (2) Front Channel/Door Jamb SO23 The door jambs reinforce the door opening and provide an attractive 9365 trim.
Page 24
● Parts Needed For ● ● ● ● ● ● 8576 Right Gable (2) Step 11 ● ● ● ● ● 8577 Left Gable (2) Gable Assemblies ● ● ● ● ● 6635 Roof Beam Bracket (4) SR24 The gables go on top of the front and rear walls to support the roof beams.
Page 25
● ● ● ● ● Left Gable Assemblies (2) ● Parts Needed For ● Step 12 ● ● ● ● ● Right Gable Assemblies (2) Gables/Braces ● ● ● ● ● 9009 Gable Brace (2) SR25 Lift and fasten a right and left gable, under angle at corner, to the door track and rear wall angle with screws.
Page 26
● Parts Needed For ● ● ● ● ● ● Main Roof Beam Assembly (1) Step 13 ● ● ● ● ● Single Roof Beam Assemblies (2) Roof Beam//Braces ● ● ● ● ● 9204 Roof Beam Brace (2) SP26 Wrap the weather stripping tape STEP around the two joined edges of the...
Page 27
● Parts Needed For ● Step 14 ● ● ● ● ● 9984 Right Roof Panel (1) Right Roof Panel SP27 Installing the roof panels is best done with a step ladder. Install the first roof panel at the back right corner of the building.
Page 28
● Parts Needed For ● ● ● ● ● ● 9983 Left Roof Panel (1) Step 15 ● ● ● ● ● 7743 Roof Panel (2) Ridge Cap & Panels ● ● ● ● ● 6797 Ridge Cap (1) SP28 Install a left roof panel 9983 at the Screws To left rear corner of the roof.
Page 29
● Parts Needed For ● ● ● ● ● ● 7743 Roof Panel (4) Step 16 ● ● ● ● ● 6869 Ridge Cap (1) Ridge Cap & Panels SP29 Install the second ridge cap 6869 overlapping the first ridge cap while installing four roof panels 7743.
Page 30
● ● ● ● ● 6797 Ridge Cap (1) ● Parts Needed For ● ● ● ● ● ● 7743 Roof Panel (2) Step 17 ● ● ● ● ● 9983 Left Roof Panel (1) Ridge Cap & Panels ● ● ● ● ● 9984 Right Roof Panel (1) SP30 Install the third ridge cap 6797 overlapping the second ridge cap...
Page 31
● Parts Needed For ● ● ● ● ● ● 6893 Left Side Roof Trim (2) Step 18 ● ● ● ● ● 6015 Side Roof Trim (2) Roof Trim ● ● ● ● ● 6892 Right Side Roof Trim (2) SP31 Attach the right, left and side roof trim pieces to the lower end of the...
Page 32
● ● ● ● ● 3719 Door Handle Brace (2) ● Parts Needed For ● ● ● ● ● ● 10475 Right and Left Doors (2) Step 19 ● ● ● ● ● 10497 Horizontal Door Brace (4) Door Assembly ●...
Page 33
● Parts Needed For ● ● ● ● ● ● Right Door Assembly (1) Step 20 ● ● ● ● ● Left Door Assembly (1) Door Installation & Adjustment SQ33 Horizontal Door Brace Gable Door Track Door Slide From inside the building, put the bottom of the right door assembly (on your left when you are inside the STEP...
Page 34
SOME FACTS ABOUT RUST SO34 SOME FACTS ABOUT RUST 1. Avoid nicking or scraping the coating surface, Rusting is a natural oxidizing process that occurs inside and out. when bare metal is exposed to moisture. Problem areas include screw holes, unfinished edges, or 2.
Need help?
Do you have a question about the OB1014-C1 and is the answer not in the manual?
Questions and answers