Summary of Contents for Arrow Group Industries EN65-A Series
Page 1
Owner's Manual & Assembly Instructions Model No. EN65-A ENB65 HM65-A HM65S NW65 SA65-A CAUTION: SOME PARTS HAVE SHARP EDGES. CARE MUST BE TAKEN WHEN HANDLING THE VARIOUS PIECES TO AVOID A MISHAP. FOR SAFETY SAKE, PLEASE READ 709310206 SAFETY INFORMATION PROVIDED IN THIS MANUAL BEFORE BEGINNING CONSTRUCTION.
Page 2
The parts list is located on page 12. •If you find that a part is missing, include the model number of your building and contact: Arrow Group Industries, Inc. Customer Service Department Route 50 East...
Page 3
PLAN AHEAD..Watch the Weather: Be sure the day you select to install your building is dry and calm. Do not attempt to assemble your building on a windy day. Be careful on wet or muddy ground. Teamwork: Whenever possible, two or more people should work together to assemble your building.
Page 4
SAFETY FIRST..Safety precautions are important to follow throughout the construction of your building. •Care must be taken when handling various •Practice caution with the tools being used in the pieces of your building since some contain assembly of this building. Be familiar with the sharp edges.
Page 5
CARE & MAINTENANCE..A5 Web Finish: For long lasting finish, periodically clean and wax the exterior surface. Touch- up scratches as soon as you notice them on your unit. Immediately clean the area with a wire brush; wash it and apply touch-up paint per manufacturer's recommendation. Roof: Keep roof clear of leaves and snow with long handled, soft-bristled broom.
Page 6
ACCESSORIES..A6 WEB ROOF STRENGTHENING FLOOR FRAME KITS (heavy snow load) KITS Extra roof beams and gable braces designed for added protection against heavy snow accumulation. Increases the strength of your roof by 50%. ANCHOR KITS Model No. AK4 MODELS FB47410, FB5465, FB106-A Anchor Kit contains heavy-duty steel FB109-A and FB1014-A augers, 60' (18m) of steel cable and 4 cable...
Page 9
Foundation The Foundation For Your Building OPTION 1: ARROW FLOOR FRAME KIT: (Order No. FB5465) Arrow has the best base for your building in this simple kit. It keeps stored items above the ground. This kit should be used with one of the following: A.
Page 10
Anchoring Anchoring Down The Building It is important that the entire floor frame be anchored after the building is erected. Below are recommended ways of anchoring. Anchoring into Wood/Post: Arrow Anchoring Kit: (Model No. AK4 or 60298) Use 1/4" Wood Screws. There are 1/4" (0,63cm) dia. Recommended for use with any suggested base.
Page 11
Hardware Remove from bag of screws and save for the last step 65900A 65103 #10Bx1/2" Black Screw (4) 65923 65004 #8-32 Hex Nut (57) (Packed with Screws) #8-32x3/8" Bolt (57) #8Ax5/16" Screw (176) 65109 67468 66646 #8-32 Acorn Nut (6) Peak Cap (2) 66045 Washer (181)
Page 12
Parts List Assembly Part Part Quantity Check Key No. Number Description in Carton List 5964 Roof Beam 5982 Roof Angle 5996 Right Gable 5997 Left Gable 6015 Side Roof Trim 6442 Right Roof Panel 6443 Left Roof Panel 6632 Horizontal Door Brace 6657 Door Handle Brace 6658...
Page 14
Parts Needed For Step 1 9396 Door Track (1) Door Track Assembly The door track assembly supports the sliding doors and reinforces the front wall. Hint: The holes in the top side of the door track are for fastening the gable to the top of the front wall in a later step.
Page 15
Parts Needed For 9403 Front Floor Frame (1) Step 2 9399 Rear Floor Frame (1) Floor Frame 9402 Side Floor Frame (2) RIGHT REAR 9402 Assemble the four corners of the 9399 floor frame using two screws at each 9402 corner as shown.
Page 16
9388 Front Corner Panel (2) Parts Needed For Step 3 9392 Rear Corner Panel (2) Corners/Wall Panels 9364 Wall Panel (2) NOTE The remainder of the building assembly Narrow requires many hours and more than one Side 9392 person. Do not continue beyond this point if you do not have enough time to com- WideSide plete the assembly today.
Page 17
9397 Rear Wall Angle (1) 9925 Rear Wall Channel (1) Parts Needed For Step 4 9926 Side Wall Channel (2) Frames 9400 Side Wall Angle (2) Door Track Assembly (1) The main frame pieces give rigidity to the side walls and provide a surface for attaching the gables which sup- port the roof.
Page 18
Step 5 Parts Needed For 8995 Wall Panel (2) Wall Panels Fasten the wall panels at the top and bottom with screws. Crimped Rib Underneath Fasten the center of each panel to the wall channel with screws. Fasten overlapping ribs as before. STEP STEP 8995...
Page 19
Parts Needed For Step 6 9900 Door Jamb (2) Door Jamb The door jambs reinforce the door opening and provide an attractive STEP trim. Follow these steps for both door (3) bolts TOP VIEW jambs. Door Track Fasten a door jamb to the front Hex Nut panel with three bolts, nuts and acorn Acorn Nut...
Page 20
5996 Right Gable (2) Parts Needed For Step 7 5997 Left Gable (2) Gables/Braces 6658 Gable Brace (2) The gables go on top of the front and rear walls to support the roof beam. STEP NOTE Gable The gables are packed nested 6658 Gable Brace together and might be mistaken as one piece.
Page 21
Parts Needed For Step 8 5964 Roof Beam (1) Roof Beam/Angle 5982 Roof Angle (1) Fasten the roof beam, small holes on top, to the gable brace of the front STEP gable. Fasten the other end of the roof Roof Angle beam to the gable brace of the rear gable.
Page 22
Parts Needed For Step 9 6442 Right Roof Panel (1) Right Roof Panel Installing the roof panels is best done with a step ladder. Install the first roof panel at the back right corner of the building. Each screw and bolt in the roof requires a washer.
Page 23
Parts Needed For Step 10 6443 Left Roof Panel (1) Left Roof Panel Install a left roof panel 6443 at the left rear corner of the roof. STEP 6443...
Page 24
Parts Needed For Step 11 6443 Left Roof Panel (1) Front of Roof 6442 Right Roof Panel (1) Cover the joint at the peak with NOTE weather stripping tape. Unroll the If roof beam holes do not line up tape and press it down over the open- with the roof panel holes, shift the ing at the ridge as you install each building from left to right.
Page 25
Parts Needed For Step 12 6869 Ridge Cap (1) Ridge Cap/Roof Trim 6015 Side Roof Trim (2) STEP Peak Cap Install the ridge cap on the com- 6869 pleted roof section using bolts and nuts. STEP Fasten the roof panel ribs, peak cap and ridge cap together using bolts and nuts.
Page 26
6657 Door Handle Brace (2) Parts Needed For 9356 Right Door (1) Step 13 9357 Left Door (1) Door Assembly 6632 Horizontal Door Brace (4) The steps on this page tell how to assemble the right door. You will perform exactly the same procedures for the left door.
Page 27
Parts Needed For Right Door Assembly (1) Step 14 Door Installation & Adjustment Left Door Assembly (1) Horizontal Door Brace Gable Door Track Door Slide From inside the building, put the bottom of the right door assembly (on your left when you are inside the building) behind door jamb into the STEP STEP...
Page 28
EN65-A ENB65 HM65-A HM65S NW65 SA65-A SOME FACTS ABOUT RUST 1. Avoid nicking or scraping the coating surface, Rusting is a natural oxidizing process that occurs inside and out. when bare metal is exposed to moisture. Problem areas include screw holes, unfinished edges, or 2.
Need help?
Do you have a question about the EN65-A Series and is the answer not in the manual?
Questions and answers