Arrow Group Industries VD108-A Owner's Manual & Assembly Instrucowner's Manual & Assembly Instructions

Advertisement

Quick Links

Owner's Manual & Assembly Instructions
Y01
Model No.
708850107
BUILDING DIMENSIONS
*Approx.
Foundation
Size
Size
10' x 8'
121" x 92 3/4"
3,0m x 2,3m 307cm x 236cm
VD108-A
* Size rounded off to the nearest foot
Storage Area
Sq. Ft. Cu. Ft.
Width
74
470
123 1/4"
2
3
6,9m
13,3m
313cm
CAUTION: SOME PARTS HAVE SHARP EDGES. CARE
MUST BE TAKEN WHEN HANDLING THE VARIOUS PIECES
TO AVOID A MISHAP. FOR SAFETY SAKE, PLEASE READ
SAFETY INFORMATION PROVIDED IN THIS MANUAL
BEFORE BEGINNING CONSTRUCTION. WEAR GLOVES
WHEN HANDLING METAL PARTS.
Exterior Dimensions
(Roof Edge to Roof Edge)
Depth
Height
95 1/4"
82 1/8"
242cm
209cm
697.68618
Interior Dimensions
(Wall to Wall)
Width
Depth
Height Width Height
118 1/4"
90"
80 7/8" 55 1/2" 69 1/4"
300cm
229cm
205cm
Door
Opening
141cm 176cm

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the VD108-A and is the answer not in the manual?

Questions and answers

Summary of Contents for Arrow Group Industries VD108-A

  • Page 1 Owner's Manual & Assembly Instructions Model No. VD108-A 697.68618 CAUTION: SOME PARTS HAVE SHARP EDGES. CARE MUST BE TAKEN WHEN HANDLING THE VARIOUS PIECES TO AVOID A MISHAP. FOR SAFETY SAKE, PLEASE READ 708850107 SAFETY INFORMATION PROVIDED IN THIS MANUAL BEFORE BEGINNING CONSTRUCTION.
  • Page 2 BEFORE YOU BEGIN..Owner's Manual Before beginning construction, check local building codes regarding footings, location and other requirements. Study and understand this owner's manual. Important information and helpful tips will make your construction easier and more enjoyable. Assembly Instructions: Instructions are supplied in this manual and contain all appropriate information for your building model.
  • Page 3: Tools And Materials

    PLAN AHEAD..BX03 Watch the Weather: Be sure the day you select to install your building is dry and calm. Do not attempt to assemble your building on a windy day. Be careful on wet or muddy ground. Teamwork: Whenever possible, two or more people should work together to assemble your building.
  • Page 4 SAFETY FIRST..Safety precautions are important to follow throughout the construction of your building. •Care must be taken when handling various •Practice caution with the tools being used in the pieces of your building since some contain assembly of this building. Be familiar with the sharp edges.
  • Page 5 CARE & MAINTENANCE..A5 Web Finish: For long lasting finish, periodically clean and wax the exterior surface. Touch- up scratches as soon as you notice them on your unit. Immediately clean the area with a wire brush; wash it and apply touch-up paint per manufacturer's recommendation. Roof: Keep roof clear of leaves and snow with long handled, soft-bristled broom.
  • Page 6 ACCESSORIES..A6 WEB ROOF STRENGTHENING (heavy snow load) KITS Extra roof beams and gable braces designed for added protection against heavy snow accumulation. Increases the strength of your roof by 50%. ANCHOR KIT ANCHOR KIT Model No. AK100 Model No. AK4 New concrete anchor system permits Anchor Kit contains heavy-duty steel anchoring any size Arrow building...
  • Page 7 THIS PAGE LEFT BLANK INTENTIONALLY...
  • Page 8 THIS PAGE LEFT BLANK INTENTIONALLY...
  • Page 9 Foundation The Foundation For Your Building OPTION 1: ARROW FLOOR FRAME KIT: (Order No. FB109-A or 68385-A) Arrow has the best base for your building in this simple kit. It keeps stored items above the ground. This kit should be used with one of the following: A.
  • Page 10 Anchoring Anchoring Down The Building It is important that the entire floor frame be anchored after the building is erected. Below are recommended ways of anchoring. Anchoring into Wood/Post: Arrow Anchoring Kit: (Model No. AK4 or 60298) Use 1/4" Wood Screws. There are 1/4" (0,63cm) dia. Recommended for use with any suggested base.
  • Page 11 Hardware Remove from bag of screws and save for the last step 65900A 65103 #10Bx1/2" Black Screw (4) 65923 65004 #8-32 Hex Nut (161) #8-32x3/8" Bolt (147) #8Ax5/16" Screw (320) (Packed with Screws) 65109 66646 66045 #8-32 Acorn Nut (14) 5971 Washer (216) (Packed with Screws)
  • Page 12: Parts List

    Parts List Assembly Part Part Quantity Check Key No. Number Description in Carton List 8934 Ramp 9367 Front Floor Frame 8936 Rear Floor Frame 9338 Right Rear Wall Angle 9366 Door Track 5287 Splice Post 9339 Left Rear Wall Angle 6001 Left Gable 6000...
  • Page 13 Assembly by Key No. 30 10...
  • Page 14 ● ● ● ● ● 8934 Ramp (1) ● Parts Needed For ● ● ● ● ● ● 9367 Front Floor Frame (2) Step 1 ● ● ● ● ● 8936 Rear Floor Frame (2) Floor Frame Assemblies ● ● ● ● ● 9203 Side Floor Frame (4) The front floor frame is made up of three pieces.
  • Page 15: Frame Assemblies

    ● ● ● ● ● 9338 Right Rear Wall Angle (1) ● Parts Needed For ● ● ● ● ● ● 9339 Left Rear Wall Angle (1) Step 2 ● ● ● ● ● 9340 Right Side Wall Angle (2) Frame Assemblies ●...
  • Page 16 ● Parts Needed For ● ● ● ● ● ● 10470 Roof Beam (8) Step 3 Roof Beam Assemblies The roof beams join the two gables 10470 and support the roof panels. The main roof beam is made up of four pieces overlapped back to back at the cen- 10470 ter.
  • Page 17 ● Parts Needed For ● ● ● ● ● ● 6403 Door Track Splice (1) Step 4 ● ● ● ● ● 9366 Door Track (2) Door Track Assembly NOTE: Door Track Splice (painted part) The door track assembly supports the sliding doors and reinforces the front wall.
  • Page 18 ● ● ● ● ● Front Floor Assembly (1) ● Parts Needed For ● Step 5 ● ● ● ● ● Side Floor Assembly (2) Floor Frame ● ● ● ● ● Rear Floor Assembly (1) RIGHT REAR 9203 STEP Assemble the four corners of the 8936 floor frame using two screws at each...
  • Page 19: Top View

    ● ● ● ● ● 5288 Corner Post (4) ● Parts Needed For ● ● ● ● ● ● Door Track Assembly (1) Step 6 ● ● ● ● ● Rear Wall Angle Assembly (1) Posts/Top Frames ● ● ● ● ● Side Wall Angle Assembly (2) NOTE The remainder of the building assembly requires many hours and more than one...
  • Page 20 ● Parts Needed For ● ● ● ● ● ● 5287 Splice Post (3) Step 7 ● ● ● ● ● 7311 Door Jamb (2) Splice Post/Door Jamb STEP The door jambs reinforce the door opening and provide an attractive ANGLED END OF SPLICE POST MUST trim.
  • Page 21 ● Parts Needed For ● ● ● ● ● ● 9344 Siding Stud (6) Step 8 ● ● ● ● ● 9365 Front Wall Channel (2) Studs/Front Channel The studs provide a surface for at- taching the siding panels. Following dimensions, measuring from the ends of angles, place a stud between each corner and splice post.
  • Page 22: Side Siding

    ● Parts Needed For ● Step 9 ● ● ● ● ● 8584 Side Siding (12) Side Siding Each screw in the wall requires a washer. Slide side siding into channels of corner and splice posts, flat edge upward, bottom edge down resting on floor frame.
  • Page 23 ● Parts Needed For ● Step 10 ● ● ● ● ● 8736 Rear Siding (6) Rear/Front Siding ● ● ● ● ● 8737 Front Siding (6) STEP STEP Slide rear siding into channel of corner and splice posts fastening to Fasten Top Center of rear frame as shown in previous Last Siding to Stud...
  • Page 24 ● Parts Needed For ● ● ● ● ● ● 6000 Right Gable (2) Step 11 ● ● ● ● ● 6001 Left Gable (2) Gable Assemblies ● ● ● ● ● 5971 Roof Beam Bracket (4) The gables go on top of the front and rear walls to support the roof beams.
  • Page 25 ● ● ● ● ● Left Gable Assemblies (2) ● Parts Needed For ● Step 12 ● ● ● ● ● Right Gable Assemblies (2) Gables/Braces ● ● ● ● ● 6635 Gable Brace (2) Lift and fasten a right and left gable, under angle at corner, to the rear wall angle with screws.
  • Page 26 ● Parts Needed For ● ● ● ● ● ● Main Roof Beam (1) Step 13 ● ● ● ● ● Single Roof Beam (2) Roof Beams Spread the two halves of the main STEP roof beam and fasten the roof beam to the gable brace of the front gable.
  • Page 27 ● Parts Needed For ● Step 14 ● ● ● ● ● 8468 Right Roof Panel (1) Right Roof Panel STEP Installing the roof panels is best done with a step ladder. Begin installing 8469 8468 roof panels at the back right corner of the building.
  • Page 28: Roof Assembly

    ● ● ● ● ● 8468 Right Roof Panel (1) ● ● ● ● ● 8469 Left Roof Panel (2) ● Parts Needed For ● Step 15 ● ● ● ● ● 7483 Roof Panel (2) Roof Assembly ● ● ● ● ● 6529 Roof Panel (2) ●...
  • Page 29 ● ● ● ● ● 8486 Ridge Cap (1) ● Parts Needed For ● ● ● ● ● ● 7483 Roof Panel (2) Step 16 ● ● ● ● ● 8486 Ridge Cap (1) Panels/Ridge Cap/Trim ● ● ● ● ● 8485 Left Side Roof Trim (2) ●...
  • Page 30: Door Assembly

    ● ● ● ● ● 67731 Foam Board (2) ● Parts Needed For ● ● ● ● ● ● 9934 Right Door (1) Step 17 ● ● ● ● ● 9935 Left Door (1) Door Assembly ● ● ● ● ● 7667 Horizontal Door Brace (4) ●...
  • Page 31 ● Parts Needed For ● ● ● ● ● ● Right Door Assembly (1) Step 18 ● ● ● ● ● Left Door Assembly (1) Door Installation & Adjustment Horizontal Door Brace Gable Door Track Door Slide From inside the building, put the bottom of the right door assembly (on your left when you are inside the STEP...
  • Page 32 VD108-A 697.68618 SOME FACTS ABOUT RUST 1. Avoid nicking or scraping the coating surface, Rusting is a natural oxidizing process that occurs inside and out. when bare metal is exposed to moisture. Problem areas include screw holes, unfinished edges, or 2.

This manual is also suitable for:

697.68618

Table of Contents