Slant/Fin SENTRY SX-150 Installation And Operating Instructions Manual page 6

Gas-fired cast-iron boilers for natural and l.p. propane gases
Hide thumbs Also See for SENTRY SX-150:
Table of Contents

Advertisement

6
Figure 4.
TABLE
Vent
Size
4"
5"
6"
A
9
5
"
10
5
"
11
5
"
1 6
1 6
1 6
Figure 5. Vent Damper Dimensions
Figure 6. Connecting "RECEPTACLE B" to "MALE PLUG" inside
L8148E Aquastat Box for Sentry Packaged "S" and
"SX" boilers.
7"
8"
12
5
"
13
5
"
1 6
1 6
Figure 8. Damper Vane
Figure 9.
WARNING—DANGER
Once you have begun vent damper installation procedure, DO
NOT restore electric power and gas supply until installation
and inspection have been completed (in order to prevent the
main burners from operating). DO NOT operate the boiler until
the vent damper harness "RECEPTACLE B" is plugged into
"MALE PLUG" (as described in the installation instructions),
and the vent damper installation and checkout procedures
have been completed. Failure to observe this warning may
create a hazardous condition that could cause an explosion or
carbon monoxide poisoning.
Sentry

Advertisement

Table of Contents
loading

Table of Contents