Removal And Replacement: Bin Controls - Scotsman FME504 Installation And User Manual

Fme504, fme804, nme454, nme654, series flake and nugget ice machine
Hide thumbs Also See for FME504:
Table of Contents

Advertisement

NME454, 654 & FME504, 804

REMOVAL AND REPLACEMENT: Bin Controls

BIN CONTROLS (Ice Level Sensors)
1. Disconnect electrical power.
2. Remove front panel.
3. Remove control box cover.
4. Locate ice chute, at the base of the chute, in
front of and behind it are two plastic bin control
mounts.
5. Slide each bin control to the left, and in the
control box, disconnect the electrical leads
connecting the bin control to the circuit board.
6. Reverse to reassemble, be certain that the bin
controls are aligned so that the ice level sensors
are visible (centered) through the holes in the ice
chute.
RESERVOIR
1. Shut off water supply.
2. Remove front panel.
3. Remove reservoir cover.
4. Disconnect water inlet tube from reservoir inlet
fitting.
5. To remove float valve, push in on "Locking Tab"
as shown and pull valve up.
Note: The plunger/seat is available as a separate
part.
6. To remove reservoir, pull up and remove water
sensor.
7. Disconnect water outlet tubes.
8. Remove the two screws holding reservoir to
bracket.
9. Remove reservoir from ice machine.
10. Reverse steps 1-9 to reassemble.
SLIDE BIN
CONTROLS
LEFT AND
RIGHT
FLOAT
ASSEMBLY
LOCKING
TABS
January 2007
Page 14
ICE
CHUTE
Water
Sensor

Advertisement

Table of Contents
loading

Table of Contents