  • Page 1 Peerless Partner ® ® Indirect-Fired Water Heater I n s t a l l a t i o n , O p e r a t i o n & M a i n t e n a n c e M a n u a l...
  • Page 2: Product Selection

    Temperature limiting valves are available, see manual. NOTICE The Peerless Partner indirect-fired water heater is deemed to be used in a "commercial setting" if at any time the unit is operated at a temperature over 150°F. Refer to warranty for additional information.
  • Page 3 PP-40 or PP-60 piped in series with an unfired storage tank (i.e. electric water heater without heating elements energized). If Peerless Partner is to be used with Peerless Boilers Series 63 or Series 64 steam boiler, refer to Series 63/64 Installation, Operation and Maintenance Manual for special installation and operation instructions.
  • Page 4: Pre-Installation Considerations

    Table 2: First Hour Ratings for Reduced Boiler Output PP-30-LB PP-40 PP-60 PP-80 PP-120 Boiler Output [Btu per hour} 140°F 115°F 140°F 115°F 140°F 115°F 140°F 115°F 140°F 115°F – – – – – – 40,000 – – – –...
  • Page 5 4. Peerless Partner(s) may be located adjacent to boiler to reduce piping heat loss or central to points of use to reduce response time to fixtures. a. Install indoors in an area not exposed to freezing temperatures. Do not install outdoors.
  • Page 6 Domestic Hot Water Out with Mixing Valve. See Figure 4. 3. Boiler. Install Peerless Partner as a separate space heating zone. Place boiler circulator(s) in boiler supply piping. For boiler with tankless heater, disconnect domestic water piping and limit control (where used).
  • Page 7 Figure 6: Unfired Storage Tank Electrical 1. The Peerless Partner must be electrically grounded in accordance with local codes. In the absence of local codes follow the National Electrical Code , ANSI/NFPA 70. 2. Install thermostat provided with Peerless Partner. Insert bulb into immersion well. Secure to well by tightening screws on case.
  • Page 8 10-15°F range. 5. Operate boiler until Peerless Partner thermostat satisfied. Measure domestic water temperature at hot water faucet. See Paragraph 3 above. 6. Draw hot water and allow Peerless Partner to operate through several recovery cycles to verify proper operation.
  • Page 9: Maintenance

    Controls on this appliance could ignite vapors causing an explosion. 2. Clean Inside of Tank (monthly). a. Mark temperature setting on Peerless Partner thermostat. Set thermostat to lowest setting. b. Close cold water inlet shutoff valve. Open a hot water faucet.
  • Page 10 Recovery Time [Minutes] = ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- x 60 ------------------------- Boiler Output -------------- * Example No.1: A Peerless Partner PP-40 with a Peerless MI-03 gas boiler (DOE Heating Capacity of 58 Mbh). The desired water temperature is 115°F. Cold water temperature is 55°F.
  • Page 11: Repair Parts

    Capacity [U.S. Floor to Floor to Floor to Floor to Diameter Height Gallons] ‘Boiler In’ ‘Boiler Out’ ‘Cold - Drain’ ‘Hot - T&P’ Test Working PP-30-LB 23¼ 28½ 4½ 4½ PP-40 19¼ 52½ 4½ 4½ PP-60 23¼ 52½ 4½ 4½...