Temporary Installation Of A Disengaged Track - Honda HP250 Owner's Manual

Power carrier
Table of Contents

Advertisement

Temporary
installation
of a disengaged-track
In the unlikely event that a track slips off the sprockets during operation, pro-
ceed with the following:
1. Stop the engine (refer to page 20).
2. Remove any load in the carrier, by hand. Do not empty it by dumping
the carrier.
3. Move the power carrier to a flat surface and support on wood blocks in
two locations (so the wheels are off the ground). Dump the carrier.
CAUTION:
A carrier with a disengaged track will fall over if the carrier is
dumped, unless first secured with wood blocks.
4. Loosen the track tension lock nuts and tighten up the inner nut as far as
it will go. (This is done in order to facilitate
the mounting
of the track.)
5. Remove the sprocket bolts.
\
LOCK NUTS
I
PiUG
U
/
14 x 19 WRENCH
WRENCH
SPROCKET
BOLTS
WOODEii-8LOCKS
43

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents