New Construction - Hunter Orleans 82704 Owner's Manual

Bath ventilator with light
Table of Contents

Advertisement

9
Pop out the first wiring access slug. Use second if needed.
For New Construction go to step A11, page 5
For Existing Construction go to step B11, page 8

New Construction

A11
5/8
1/2
Position the correct depth mark at the bottom edge of the
joist based on the thickness of your sheetrock.
10
E
Insert the strain relief (not included) into the housing and
Choose Installation Option
A12
E
5/8
1/2
Screw pre-loaded screws into joist or framing.
5
42906-01 06142010
C
B
secure with washer.

Advertisement

Table of Contents
loading

Table of Contents