New Construction - Hunter Orleans 82006 Installation Manual

Bath ventilator with light
Table of Contents

Advertisement

Available languages

Available languages

9
Pop out the first wiring access slug. Use second if needed.

New Construction

A11
Position the correct depth mark at the bottom edge of the
joist based on the thickness of your sheetrock.
41947-01 3/29/2006
05-HF-016-EngS_3.29.06.indd 5
Choose Installation Option
For New Construction - go to step A11, page 5
For Existing Construction - go to step B11, page 8
5/8
1/2
10
E
Insert the strain relief (not included) into the housing and
A12
E
5/8
1/2
Screw pre-loaded screws into joist or framing.
C
B
secure with washer.
5
3/29/06 6:40:50 PM

Advertisement

Table of Contents
loading

This manual is also suitable for:

8200582003

Table of Contents