Connection Of Tubing; Feedwater Tubing - Millipore DIRECT-Q 3 SYSTEM User Manual

Water purification system
Table of Contents

Advertisement

4-2 C
ONNECTION OF
Rotate the Direct-Q so you can see the back of the system (see photo A).
A
1.
FEEDWATER
TUBING
2. REJECT
TUBING
F
T
EEDWATER
UBING
Locate the Feedwater Tubing exiting from the bottom middle of the system (B). A 1/2 inch Female
GAZ fitting with a screen filter is attached at the end of this tubing. Unroll it until the fitting reaches
the Feedwater source.
Apply white tape on the thread of the 1/2 inch Male GAZ valve or fitting of the Feedwater source.
Connect the fitting to the valve (C).
B
T
UBING
1
2
C

FEEDWATER TUBING

- 10 -
I
NSTALLATION
3
3.
OVERFLOW
TUBING
4. TANK
4
OUTLET

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the DIRECT-Q 3 SYSTEM and is the answer not in the manual?

This manual is also suitable for:

Direct-q 3 uv system

Table of Contents

Save PDF