Final Installation Checklist - Samsung DV210A Series User Manual

Gas and electric dryer
Hide thumbs Also See for DV210A Series:
Table of Contents

Advertisement

Available languages

Available languages

3-WIRE system connections
A. External ground connector
B. Neutral grounding wire (green/yellow)
C. Center silver-colored terminal block screw
D. Neutral wire (white or center wire)
E. ¾" (1.9 cm) UL-listed strain relief
1. Loosen or remove the center terminal block screw.
2. Connect the neutral wire (white or center wire) of the power cord to the center, silver-
colored terminal screw of the terminal block. Tighten screw.
3. Connect the other wires to outer terminal block screws. Tighten screws.
4. Tighten the strain relief screws.
5. Insert the tab of the terminal block cover into your Dryer's rear panel slot.
Secure the cover with a hold-down screw.
If converting from a 4-wire electrical system to a 3-wire, the ground strap must be
reconnected to the terminal block support to ground the Dryer frame to the neutral conductor.
WARNING
4-WIRE system connections
A. External ground connector
B. Green or bare copper wire of power cord
C. ¾" (1.9 cm) UL-listed strain relief
D. Center silver-colored terminal block screw
E. Neutral Grounding wire (green/yellow)
F. Neutral wire (white or center wire)
1. Remove the External ground connector screw.
2. Connect the ground wire (green or unwrapped) of the power cord to the external ground
connector screw. If you want to connect B(Green or bare copper wire of power cord) to
the Neutral Post without assembling with A(cabinet ground), call the service technician.
3. Loosen or remove the center terminal block screw.
4. Connect the neutral wire (white or center wire) of the power cord and the appliance
ground wire (green with yellow stripes) under the central screw of the terminal block.
5. Connect the other wires to the outer terminal block screws. Tighten screws.
6. Tighten the strain relief screws.
7. Insert the tab of the terminal block cover into your Dryer's rear panel slot.
Secure the cover with a hold-down screw.
7. With a level, check your Dryer and make necessary adjustments to the leveling legs.
8. At this time, make sure all gas connections (on gas models), exhaust and electrical connections are
complete. Plug in your Dryer, and check operation by using the checklist below.
9. GAS MODELS ONLY
The burner may not ignite initially due to air in the gas line. Allowing your Dryer to operate on a heat
setting will purge the line. If the gas does not ignite within 5 minutes, turn your Dryer off and wait 5
minutes. Be sure the gas supply to your Dryer has been turned on. In order to confirm gas ignition,
check the exhaust for heat.

FINAL INSTALLATION CHECKLIST

 The dryer is plugged into an electrical outlet and grounded properly.
 The exhaust ductwork is hooked up and the joints are taped.
 You have used rigid or stiff-walled flexible metal duct material, not plastic flexible duct.
 The dryer is level and is sitting firmly on the floor.
 For gas models: The gas is turned on and there are no gas leaks.
 Start your dryer to confirm that it runs, heats, and shuts off.
installing your dryer _17

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Dv221a seriesDv220a series

Table of Contents