Quadra-Fire Yosemite YOSEMITE-MBK Installation & Operation Manual page 8

Yosemite series non-catalytic, front/side load, wood heater
Table of Contents

Advertisement

R
DRAWINGS ARE FOR
ILLUSTRATION PUR-
POSES ONLY AND
ARE NOT TO SCALE.
Figure 8A
Figure 8B
Figure 8C
Page 8
Yosemite Wood Stove
SIDE FUEL DOOR LOCKED SHUT - CORNER
44-3/4"
USA Installations
BOTH FUEL DOORS ACCESSIBLE- CORNER
48-1/2"
optional
coverage
36-3/4"
8"
11-3/8"
HORIZONTAL VENTING
41-3/8"
optional coverage
44-1/2"
16"
Fuel loading door
27-1/4"
16"
required coverage
17-1/4"
Floor protection must extend
length of flue and 2 inches
(51mm) beyond each side of
pipe (shaded area).
optional
coverage
7004-187F September 1, 2008