5.2
DELIVERY
5.2.1
The appliance carton containing (Fig 10)
a) boiler fully assembled
b) installation instructions and
user instructions
c) white paper template
Polythene bag containing
a) 2-22 mm flanged copper tails complete
with 3/4" brass nuts and washers
b) 1-15 mm compression ball valve
(with drain screw for domestic cold water inlet)
c) 1-1/2" BSP Union Gas Cock
d) - 2.15 mm flanged copper tails complete
with 1/2" brass nuts and washers
- 2.22 mm flanged copper tails complete
with 1/2" brass nuts and washers
e) - 4 coach bolts and wall plugs
- screws and dowels
Separate Box containing (Fig 12)
Horizontal CSI flue kit
56 - Flue gas assembly
57 - Flue bend assembly
59 - Rubber seal Ø 60
60 - Air intake duct
61 - Flue exhaust duct
62 - Terminal
65 - Pipe centering spring
66 - Flue gas sample point
127 - Terminal Cover Plate
OPTIONAL EXTRAS:
Small carton containing: (Fig 13)
57 - Straight header supplied as an extra cost only
when requested
59 - Rubber seal 0 60
66 - Flue gas sample point
FLUE EXTENSION BOX CONTAINING (Fig. 14)
1000 mm flue extension duct as an extra cost only when
requested for side and vertical flue applications
59 - Rubber seal Ø 60
63 - Air intake duct extension
64 - Flue exhaust duct extension
65 - Pipe centering spring
16
WARNING
Maximum allowable flue length 2.5 m
maximum No 2x1000 mm
Flue duct extension used with standard flue