Download Print this page

Husqvarna 966529102 Operator And Parts Manual page 10

Blower kit 48" collection system

Advertisement

7
MOUNTING COVER ASSEMBLY
NOTE: Assistance from another person may ease
mounting the cover assembly to mower.
1.
Lift and rotate cover to align the cover brackets
with support assembly tubes.
2.
Slide the cover down over the support tubes until
secure.
8
INSTALLING CHUTES
1.
Place middle chute over the top end of the blower
assembly. Stretch the chute latch on the blower
assembly up and onto the acorn nut on the middle
chute.
2.
Slide the upper chute discharge end into the
hood inlet and fit the lower end over middle chute.
Secure middle chute to upper as in Step 1.
3.
Rotate the chute so the opening is facing
downwards toward the container bags.
Chute Latch
10
ASSEMBLY
8063-089
Middle Chute
8063-082
9
INSTALLING SPACER PLUGS
1.
Remove plastic end caps from the center two bag
support arms. Fully insert spacer plugs into the
ends of the support tubes. It may be necessary
to tap the spacers into place with a hammer or
mallet. Replace the plastic end cap back over
the spacer. The additional extension will hold the
hood more securely when latched.
Remove center
end caps
Insert spacers
and replace caps
10
CONTAINER INSTALLATION
1.
Install containers on support frame, overlapping
containers at center tube.
Note: One container should always overlap the
other container at the center tube.
2.
Close cover and lock latch handle over support
tubes.
8063-049
8063-093

Hide quick links:

Advertisement

loading